My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Grant Application for Solar Power Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 26 - Grant Application for Solar Power Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:46:28 AM
Creation date
8/17/2023 11:57:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6: POTENTIAL FOR HEAD RECOVERY AT MWD CONNECTIONS <br />Figure 2 <br />SA-1 Proposed Configuration <br />Ball Valve <br />New Generator with Motorized <br />Flow Controller <br />Normally �Norm�ally❑pen <br />New Turbine PRV <br />Pump ROOM] � <br />Motorized <br />15 <br />MW❑ I I PRV To Santa Ana <br />Distribution <br />New Construction <br />The original pressure drop was designed for 200 feet, or 87 psi. The actual pressure drop appears to range from <br />217 to 275 feet, or 94 to 119 psi. A turbine should be selected that operates well over this pressure range. For <br />the purposes of this analysis, a single operating pressure differential will be used. The midpoint of the observed <br />pressure ranges is 245 feet, or 106 psi. <br />One potential turbine that could be used in place of the Byron Jackson turbine is a Canyon Hydro In -Line Turbine <br />ILT12-33-9.0. This turbine has a 12-inch supply and discharge pipes in the same configuration as the current <br />turbine, with a vertical axis and the generator mounted above the turbine. A proposal for this turbine generator <br />package is contained in the Appendix. Another proposal is presented for a turbine with a horizontal axis <br />manufactured by Gilkes. In this case the Canyon turbine is less expensive and matches the geometry of the <br />existing installation. <br />The Canyon Hydro turbine curve indicates a mechanical efficiency of 83.5% at the design point of 8 CFS and 245 <br />feet. This implies an electrical output calculated as follows: <br />&0 ft3 hp sec 62.4 lbs 0.746 kW <br />sec 245 ft Sf xft ibs ft3 x 83.5%7nech. of f.x 95%elect, off x ��p = 132 kW <br />Through the installation of a new hydro -turbine and generator at SA-1, the output of the generator will increase <br />from 68 kW to 132 kW. This will happen for the 6,645 hours per year that this connection is in use, for an <br />electrical savings of 425,280 kWh per year. Note, the existing turbine is calculated to generate 68 kW x 6,645 <br />hours per year, or 425,299 kWh per year of renewable electricity. <br />Newcomb I Anderson I McCormick CITY OF SANTA ANA <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.