My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Grant Application for Solar Power Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 26 - Grant Application for Solar Power Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:46:28 AM
Creation date
8/17/2023 11:57:11 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
26
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6: POTENTIAL FOR HEAD RECOVERY AT MWD CONNECTIONS 17 <br />6.4 MWD STATION SA-3 <br />The pressure reducing station SA-3 is installed in a vault under the sidewalk at the south east corner of Bristol <br />Street and McFadden Avenue. The configuration is shown in Figure 3, with one PRV and two isolation valves, <br />approximately eight feet below the sidewalk. The SCADA monitoring and associated electrical meter are <br />installed in small cabinets mounted nearby on the sidewalk. The SCE Service Account is 3-035-8796-80 and the <br />Rate Schedule is TOU-GS-1-A. <br />The PRV flow rate is typically controlled to 8 CFS when in use. The observed pressure drop was from 172 to 85 <br />psig, according to the installed pressure gages. <br />MWD <br />Figure 3 <br />SA-3 Existing Configuration <br />Vault Under Sidewalk <br />6.5 POTENTIAL PROJECT AT SA-3 <br />To Santa Ana <br />❑istribution <br />The proposed project at SA-3 is to install a new hydro -turbine generator in parallel with the existing Pressure <br />Reducing Valve. There is no room in the existing vault, so a new vault would be required side by side with the <br />existing vault. This is illustrated in Figure 4. The new vault would contain the new hydro -turbine and generator, <br />a remotely controlled valve on the inlet of the turbine and an isolation valve on the discharge, an electrical panel <br />to control the turbine and take power from it, a new metered connection to deliver the power to SCE, and some <br />additional SCADA points. <br />Newcomb I Anderson I McCormick CITY OF SANTA ANA <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.