Laserfiche WebLink
SECTION 6: POTENTIAL FOR HEAD RECOVERY AT MWD CONNECTIONS 21 <br />12 ft3 hp see 62.4 lbs 0.746 kW <br />sec 17 ft S50 ftlhs fta 63,5%?nech.eff. 9S%elect,off her = 143 kW <br />This assumes the same mechanical efficiency as found for the 12-inch turbine for the 8 CFS flow rate. This <br />turbine is likely to be a 14 or 16-inch unit. <br />In the case of SA-6, the anticipated full load hours of operation are expected to be 5,915 hours per year, so the <br />anticipated energy generation is 845,901 kWh per year. <br />The monetary value for this electricity based on the RES-BCT arrangement with the Generation portion of TOU- <br />GS-1-LG rate schedule is $55,131 per year. The value of the generated electricity is approximately $0.065 per <br />kWh. <br />Should the City sign up with SCE through the NEMA program, the electricity would be worth approximately <br />$0.145 per kWh, more than double the RES-BCT savings. The City would need to enter discussions with SCE and <br />possibly apply for an interconnection to determine which rate will apply to this project. <br />The projected cost to purchase and install the new hydro -turbine is $1,072,174. This involves the purchase of <br />the new turbine generator set with electrical panel and controls, the construction of a new vault below the <br />sidewalk to house the turbine and switchgear, the connection with SCE including a new transformer to accept <br />the power, and integration with the existing SCADA controls. <br />Newcomb I Anderson I McCormick CITY OF SANTA ANA <br />PREVIEW Date: Nov 03, 2021 Workspace ID: WS00800354 Funding Opportunity Number: R22AS00023 <br />