My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 03 - Affordable Housing Project at 801, 807, 809 and 809 ½ E. Santa Ana Blvd.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 03 - Affordable Housing Project at 801, 807, 809 and 809 ½ E. Santa Ana Blvd.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 11:59:37 AM
Creation date
8/17/2023 11:59:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
3
Date
12/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Loan Agreement and Ground Lease Agreement for FX Residences <br />December 7, 2021 <br />Page 10 <br />2 <br />2 <br />6 <br />4 <br />Open space will be provided through a private interior courtyard approximately 1,877 square <br />feet in size. The design and layout of the proposed courtyard creates a unique outdoor area <br />within the development that functions as a passive outdoor space. The courtyard will feature <br />an exterior art wall/mural and a robust landscape palette with a variety of hardscaping <br />materials, trees, and shrubs. Trees and shrubs include, but are not limited to, queen palms, <br />camphor and crape myrtle trees, Indian Hawthorne, red kangaroo paw, and blue ice yellow- <br />wood. Landscaping and a block wall will provide buffering/screening for the adjacent single- <br />family residences to the north. The block wall will feature a varied wall height to allow for <br />proper egress and fire access to building on the adjacent property, which is too close the <br />existing property line. <br /> <br />The Project features a Mission Revival architectural style common of many multiple-family <br />or mixed-use residential communities under construction in Santa Ana and the region. The <br />residential structure is designed to fully screen all mechanical equipment within the structure <br />and parapet walls. The Mission Revival style respects and complements the surrounding <br />neighborhood, including the Triada at the Station District located on the corner of Santa Ana <br />Boulevard and Lacy Street across the street from the Project, which was completed in 2013. <br />The Project will be constructed by the same general contractor as the Triada. Overall, the <br />project will include a design and solid construction materials that will ensure that the Project <br />ages well for the duration of the building’s lifetime. <br />The Project is proposed to be entirely affordable with 16 units of permanent supportive <br />housing for individuals experiencing chronic homelessness. Nine (9) of the units will be <br />permanent supportive housing for households earning no more than 30% of the Area <br />Median Income; seven (7) of the units will be permanent supportive housing for households <br />earning no more than 25% of the AMI; and one (1) of the units is reserved for an on-site <br />manager. There will be a local preference for chronically homeless residents of Santa Ana <br />who live or work in the City. The unit mix and rent restrictions are as follows: <br />Unit Size No. Units AMI <br />9 30% <br />7 25%1-Bedroom <br />1 Manager’s Unit <br />FISCAL IMPACT <br />Funds for the loan agreement in the amount of $962,952.30 (90% of the original award <br />amount) are available in the Low and Moderate Income Housing Asset Fund, Loans and <br />Grants account (no. 60718830-69152) for expenditure in the current fiscal year. Upon <br />approval of the appropriation adjustment by City Council in Item #14, an additional <br />$528,300 (90% of the additional award amount) will be available in the same Loans and <br />Grants account for expenditure. The remaining $165,694.70 (10%) will be budgeted and <br />included in the FY 2022-23 annual budget.
The URL can be used to link to this page
Your browser does not support the video tag.