Laserfiche WebLink
Local Project Number: N/A <br />Project Title <br />Additional Project IDs: <br />Traffic Signal Equipment Replacement <br />Type of Work: Traffic Signals <br />Project Description <br />Type of Work Description: Traffic Signals - <br />Replace outdated traffic signal and monitoring equipment, <br />such as cabinets, conflict monitors, <br />Install new traffic signals and equipment <br />controllers, CCTV, <br />and communication equipment both in the field and <br />in the traffic management <br />center. <br />Limits <br />FISCAL <br />FUND TYPE <br />ENG ROW CON/IMP O&M TOTAL TOTAL <br />City wide <br />YEAR <br />ESCALATED <br />Project Notes <br />2022 <br />Measure M2 Local <br />$0 <br />$0 <br />$100,000 $0 <br />$100,000 $103,100 <br />Fairshare <br />2023 <br />Measure M2 Local <br />$0 <br />$0 <br />$100,000 $0 <br />$100,000 $106,296 <br />Fairshare <br />2024 <br />Measure M2 Local <br />$0 <br />$0 <br />$100,000 $0 <br />$100,000 $109,591 <br />Fairshare <br />2025 <br />Measure M2 Local <br />$0 <br />$0 <br />$100,000 $0 <br />$100,000 $112,989 <br />Fairshare <br />2026 <br />Measure M2 Local <br />$0 <br />$0 <br />$100,000 $0 <br />$100,000 $116,491 <br />Fairshare <br />2027 <br />Measure M2 Local <br />$0 <br />$0 <br />$100,000 $0 <br />$100,000 $120,102 <br />Fairshare <br />2028 <br />Measure M2 Local <br />$0 <br />$0 <br />$100,000 $0 <br />$100,000 $123,826 <br />Fairshare <br />Totals: $0 $0 $700,000 $0 $700,000 $792,395 <br />Total Programmed: $700,000 <br />Local Project Number: 21-SNTA-ACE-3997 <br />Project Title <br />Additional Project IDs: 21-SNTA-ACE-3997 <br />Warner Avenue Improvements - Oak Street to Grand Avenue <br />Type of Work: Road Widening <br />Project Description <br />Type of Work Description: Road Widening - Add This segment (Oak Street to Grand Avenue) is part of the Warner Avenue Improvements project from <br />2 lanes to existing roadway in project limits <br />Main Street to Grand Avenue which would be widened to a total of six lanes (three lanes in each <br />direction) to be consistent with the City of Santa Ana Ge <br />Limits <br />FISCAL TOTAL <br />FUND TYPE ENG ROW CON/IMP O&M TOTAL <br />YEAR ESCALATED <br />Oak Street to Grand Avenue <br />Project Notes <br />$0 $0 $9,076,305 $0 $9,076,305 $9,357,670 <br />2022 Arterial CapacityEnhancements <br />(ACE) <br />Sept. SAR- no changes. SEPT SAR <br />REVIEW:W: NO PROJECT AMENDMENTNT <br />2022 Other $0 $0 $3,025,435 $0 $3,025,435 $3,119,223 <br />REQUESTED; NO SCHEDULE CHANGES: CA <br />09/27/21 <br />Totals: $0 $0 $12,101,740 $0 $12,101,740 $12,476,893 <br />Total Programmed: $12,101,740� <br />