Local Project Number: N/A
<br />Project Title
<br />Additional Project IDs:
<br />Traffic Signal Equipment Replacement
<br />Type of Work: Traffic Signals
<br />Project Description
<br />Type of Work Description: Traffic Signals -
<br />Replace outdated traffic signal and monitoring equipment,
<br />such as cabinets, conflict monitors,
<br />Install new traffic signals and equipment
<br />controllers, CCTV,
<br />and communication equipment both in the field and
<br />in the traffic management
<br />center.
<br />Limits
<br />FISCAL
<br />FUND TYPE
<br />ENG ROW CON/IMP O&M TOTAL TOTAL
<br />City wide
<br />YEAR
<br />ESCALATED
<br />Project Notes
<br />2022
<br />Measure M2 Local
<br />$0
<br />$0
<br />$100,000 $0
<br />$100,000 $103,100
<br />Fairshare
<br />2023
<br />Measure M2 Local
<br />$0
<br />$0
<br />$100,000 $0
<br />$100,000 $106,296
<br />Fairshare
<br />2024
<br />Measure M2 Local
<br />$0
<br />$0
<br />$100,000 $0
<br />$100,000 $109,591
<br />Fairshare
<br />2025
<br />Measure M2 Local
<br />$0
<br />$0
<br />$100,000 $0
<br />$100,000 $112,989
<br />Fairshare
<br />2026
<br />Measure M2 Local
<br />$0
<br />$0
<br />$100,000 $0
<br />$100,000 $116,491
<br />Fairshare
<br />2027
<br />Measure M2 Local
<br />$0
<br />$0
<br />$100,000 $0
<br />$100,000 $120,102
<br />Fairshare
<br />2028
<br />Measure M2 Local
<br />$0
<br />$0
<br />$100,000 $0
<br />$100,000 $123,826
<br />Fairshare
<br />Totals: $0 $0 $700,000 $0 $700,000 $792,395
<br />Total Programmed: $700,000
<br />Local Project Number: 21-SNTA-ACE-3997
<br />Project Title
<br />Additional Project IDs: 21-SNTA-ACE-3997
<br />Warner Avenue Improvements - Oak Street to Grand Avenue
<br />Type of Work: Road Widening
<br />Project Description
<br />Type of Work Description: Road Widening - Add This segment (Oak Street to Grand Avenue) is part of the Warner Avenue Improvements project from
<br />2 lanes to existing roadway in project limits
<br />Main Street to Grand Avenue which would be widened to a total of six lanes (three lanes in each
<br />direction) to be consistent with the City of Santa Ana Ge
<br />Limits
<br />FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />YEAR ESCALATED
<br />Oak Street to Grand Avenue
<br />Project Notes
<br />$0 $0 $9,076,305 $0 $9,076,305 $9,357,670
<br />2022 Arterial CapacityEnhancements
<br />(ACE)
<br />Sept. SAR- no changes. SEPT SAR
<br />REVIEW:W: NO PROJECT AMENDMENTNT
<br />2022 Other $0 $0 $3,025,435 $0 $3,025,435 $3,119,223
<br />REQUESTED; NO SCHEDULE CHANGES: CA
<br />09/27/21
<br />Totals: $0 $0 $12,101,740 $0 $12,101,740 $12,476,893
<br />Total Programmed: $12,101,740�