Laserfiche WebLink
Local Project Number: 20-SNTA-ACE-3968 Project Title <br />Additional Project IDs: 20-SNTA-ACE-3968 Bristol Street Improvements Phase 3A - Civic Center Drive to Washington Avenue <br />Type of Work: Road Widening Project Description <br />Type of Work Description: Road Widening - Add Bristol Street from Civic Center Drive to Washington Avenue would be widened to a total of six lanes <br />1 lane to existing roadway in project limits (three lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation <br />Element and the County of Orange Master Plan of <br />Limits FISCAL TOTAL <br />FUND TYPE ENG ROW CON/IMP O&M TOTAL <br />Civic Center Drive to Washington Avenue YEAR ESCALATED <br />Project Notes 2023 Federal $0 $0 $793,760 $0 $793,760 $843,736 <br />SEPT 2021 SAR REVIEW: PROJECT 2023 Arterial Capacity <br />AMENDMENT REQUESTED (24-MONTH FUNDS Enhancements (ACE) <br />EXTENSION). CITY ADVISED BY OCTA TO 2023 Other <br />POSTPONE FUNDS EXTENSION REQUEST TO <br />A LATER SEMI-ANNUAL REVIEW CYCLE <br />AFTER AWARDING A <br />CONTRACT/ENCUMBERING PROJECT FUNDS; <br />SCHEDULE UPDATED; CITY STATES ON <br />TRACK TO AWARD BY THE JUNE 30, 2023 <br />DEADLINE: CA 09/27/21 <br />Last Revised: 21-00 - Submitted <br />$0 $0 $3,273,573 $0 $3,273,573 $3,479,680 <br />$0 $0 $297,431 $0 $297,431 $316,158 <br />Totals: $0 $0 $4,364,764 $0 $4,364,764 $4,639,574 <br />Total Programmed: $4,364,764I <br />Local Project Number: 20-SNTA-ACE-3969 <br />Project Title <br />Additional Project IDs: 20-SNTA-ACE-3969 <br />Bristol Street Improvements Phase 4 - Warner Avenue to St. Andrew Place <br />Type of Work: Road Widening <br />Project Description <br />Type of Work Description: Road Widening - Add Bristol Street from Warner Avenue to St. Andrew Place would be widened to a total of six lanes (three <br />2 lanes to existing roadway in project limits <br />lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation <br />Element <br />and the County of Orange Master Plan of Arteri <br />Limits <br />FISCAL FUND TYPE ENG ROW CON/IMP O&M TOTAL <br />YEAR <br />TOTAL <br />ESCALATED <br />Warner Avenue to St. Andrew Place <br />Project Notes <br />2023 Other $0 $0 $992,357 $0 $992,357 <br />$1,054,837 <br />SEPT 2021 SAR REVIEW: NO PROJECT <br />2023 Federal $0 $0 $1,508,045 $0 $1,508,045 <br />$1,602,993 <br />AMENDMENT REQUESTED; NO SCHEDULE <br />2023 Arterial Capacity $0 $0 $7,501,206 $0 $7,501,206 <br />$7,973,489 <br />CHANGES: CA 09/27/21 REMINDER: Award <br />Enhancements (ACE) <br />Deadline is 06/30/23. <br />Lagt Revised: 21-00 - Submitted <br />Totals: $0 $0 $10,001,608 $0 $10,001,608 $10,631,319 <br />Total Programmed: $10,001,608� <br />Local Project Number: N/A Project Title <br />Additional Project IDs: Citywide Speed Limit Study <br />Type of Work: Transportation Planning Project Description <br />Type of Work Description: Transportation This project will provide for the hiring of a traffic engineering consultant to conduct an engineering and <br />Planning - Engineering traffic survey to update speed limits Citywide in accordance with state law requirements. Project scope <br />includes installation of new signs as <br />Limits FISCAL TOTAL <br />FUND TYPE ENG ROW CON/IMP O&M TOTAL <br />Citywide YEAR ESCALATED <br />Project Notes 2022 Measure M2 Local $70,000 $0 $0 $0 $70,000 $70,000 <br />Fairshare <br />Last Revised: 21-00 - <br />Totals: $70,000 $0 $0 $0 $70,000 $70,000 <br />Total Programmed: $70,000 <br />