Local Project Number: 20-SNTA-ACE-3968 Project Title
<br />Additional Project IDs: 20-SNTA-ACE-3968 Bristol Street Improvements Phase 3A - Civic Center Drive to Washington Avenue
<br />Type of Work: Road Widening Project Description
<br />Type of Work Description: Road Widening - Add Bristol Street from Civic Center Drive to Washington Avenue would be widened to a total of six lanes
<br />1 lane to existing roadway in project limits (three lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation
<br />Element and the County of Orange Master Plan of
<br />Limits FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />Civic Center Drive to Washington Avenue YEAR ESCALATED
<br />Project Notes 2023 Federal $0 $0 $793,760 $0 $793,760 $843,736
<br />SEPT 2021 SAR REVIEW: PROJECT 2023 Arterial Capacity
<br />AMENDMENT REQUESTED (24-MONTH FUNDS Enhancements (ACE)
<br />EXTENSION). CITY ADVISED BY OCTA TO 2023 Other
<br />POSTPONE FUNDS EXTENSION REQUEST TO
<br />A LATER SEMI-ANNUAL REVIEW CYCLE
<br />AFTER AWARDING A
<br />CONTRACT/ENCUMBERING PROJECT FUNDS;
<br />SCHEDULE UPDATED; CITY STATES ON
<br />TRACK TO AWARD BY THE JUNE 30, 2023
<br />DEADLINE: CA 09/27/21
<br />Last Revised: 21-00 - Submitted
<br />$0 $0 $3,273,573 $0 $3,273,573 $3,479,680
<br />$0 $0 $297,431 $0 $297,431 $316,158
<br />Totals: $0 $0 $4,364,764 $0 $4,364,764 $4,639,574
<br />Total Programmed: $4,364,764I
<br />Local Project Number: 20-SNTA-ACE-3969
<br />Project Title
<br />Additional Project IDs: 20-SNTA-ACE-3969
<br />Bristol Street Improvements Phase 4 - Warner Avenue to St. Andrew Place
<br />Type of Work: Road Widening
<br />Project Description
<br />Type of Work Description: Road Widening - Add Bristol Street from Warner Avenue to St. Andrew Place would be widened to a total of six lanes (three
<br />2 lanes to existing roadway in project limits
<br />lanes in each direction) to be consistent with the City of Santa Ana General Plan Circulation
<br />Element
<br />and the County of Orange Master Plan of Arteri
<br />Limits
<br />FISCAL FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />YEAR
<br />TOTAL
<br />ESCALATED
<br />Warner Avenue to St. Andrew Place
<br />Project Notes
<br />2023 Other $0 $0 $992,357 $0 $992,357
<br />$1,054,837
<br />SEPT 2021 SAR REVIEW: NO PROJECT
<br />2023 Federal $0 $0 $1,508,045 $0 $1,508,045
<br />$1,602,993
<br />AMENDMENT REQUESTED; NO SCHEDULE
<br />2023 Arterial Capacity $0 $0 $7,501,206 $0 $7,501,206
<br />$7,973,489
<br />CHANGES: CA 09/27/21 REMINDER: Award
<br />Enhancements (ACE)
<br />Deadline is 06/30/23.
<br />Lagt Revised: 21-00 - Submitted
<br />Totals: $0 $0 $10,001,608 $0 $10,001,608 $10,631,319
<br />Total Programmed: $10,001,608�
<br />Local Project Number: N/A Project Title
<br />Additional Project IDs: Citywide Speed Limit Study
<br />Type of Work: Transportation Planning Project Description
<br />Type of Work Description: Transportation This project will provide for the hiring of a traffic engineering consultant to conduct an engineering and
<br />Planning - Engineering traffic survey to update speed limits Citywide in accordance with state law requirements. Project scope
<br />includes installation of new signs as
<br />Limits FISCAL TOTAL
<br />FUND TYPE ENG ROW CON/IMP O&M TOTAL
<br />Citywide YEAR ESCALATED
<br />Project Notes 2022 Measure M2 Local $70,000 $0 $0 $0 $70,000 $70,000
<br />Fairshare
<br />Last Revised: 21-00 -
<br />Totals: $70,000 $0 $0 $0 $70,000 $70,000
<br />Total Programmed: $70,000