My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 37 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:57:39 AM
Creation date
8/17/2023 12:02:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Responsible <br />Document <br />Location <br />Completion Date <br />Implementing <br />Responsible <br />(Monitoring <br />Responsible <br />Project Mitigation <br />Mitigation Measure <br />Timing <br />Party <br />Monitoring Party <br />Record) <br />Monitoring Party <br />Monitor <br />• Composting, green waste, or recycling facilities <br />• Fiberglass manufacturing facilities <br />Painting/coating operations <br />• Large -capacity coffee roasters <br />• Food -processing facilities <br />The odor management plan shall demonstrate compliance with the <br />South Coast Air Quality Management District's Rule 402 for nuisance <br />odors. The Odor Management Plan shall identify the best available <br />control technologies for toxics (T-BACTs) that will be utilized to reduce <br />potential odors to acceptable levels, including appropriate enforcement <br />mechanisms. T-BACTs may include but are not limited to scrubbers <br />(i.e., air pollution control devices) at the industrial facility. T-BACTs <br />identified in the odor management plan shall be identified as mitigation <br />measures in the environmental document prepared for the development <br />project and/or incorporated into the project's site plan. <br />5.3 BIOLOGICAL RESOURCES <br />BIO-1 For development or redevelopment projects that would disturb <br />Concurrent with <br />Project Applicant/ <br />City of Santa <br />City of Santa <br />vegetated land or major stream and are subject to CEQA, a qualified <br />submittal of site <br />Developer <br />Ana Building <br />Ana Building <br />biologist shall conduct an initial screening to determine whether a site- <br />development plans <br />Safety Division <br />Safety Division <br />specific biological resource report is warranted. If needed, a qualified <br />and prior to the <br />biologist shall conduct a field survey for the site and prepare a <br />issuance of <br />biological resource assessment for the project, including an <br />grading permits <br />assessment of potential impacts to sensitive species, habitats, and <br />jurisdictional waters. The report shall recommend mitigation measures, <br />as appropriate, to avoid or limit potential biological resource impacts to <br />less than significant. <br />5.4 CULTURAL RESOURCES <br />CUL-1 Identification of Historical Resources and Potential Project <br />Prior to issuance <br />Project <br />City of Santa <br />City of Santa <br />Impacts. For structures 45 years or older, a Historical Resources <br />of grading permits <br />Applicant/ <br />Ana Building <br />Ana Building <br />Assessment (HRA) shall be prepared by an architectural historian or <br />Developer <br />Safety Division <br />Safety <br />historian meeting the Secretary of the Interior's Professional <br />Division <br />October 2021 <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.