My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
12/07/2021 Regular
>
Item 37 - EIR No. 2020-03 and GPA No.2020-06 Santa Ana General Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 8:57:39 AM
Creation date
8/17/2023 12:02:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
12/7/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
591
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Document <br />Completion Date <br />Responsible <br />Location <br />Implementing <br />Responsible <br />(Monitoring <br />Responsible <br />Project Mitigation <br />Mitigation Measure <br />Timing <br />Party <br />Monitoring Party <br />Record) <br />Monitoring Party <br />Monitor <br />GEO-2 Low -to -High Sensitivity. Prior to issuance of a grading permit for <br />Prior to the <br />Project <br />City of Santa <br />City of Santa <br />projects involving ground disturbance in previously undisturbed areas <br />issuance of <br />Applicant/ <br />Ana Building <br />Ana Building <br />mapped with "low -to -high" paleontological sensitivity (see Figure 5.6-3), <br />grading permits <br />Developer <br />Safety Division <br />Safety <br />the project applicant shall consult with a geologist or paleontologist to <br />Division <br />confirm whether the grading would occur at depths that could <br />encounter highly sensitive sediments for paleontological resources. If <br />confirmed that underlying sediments may have high sensitivity, <br />construction activity shall be monitored by a qualified paleontologist. <br />The paleontologist shall have the authority to halt construction during <br />construction activity as outlined in Mitigation Measure GEO-3. <br />GEO-3 All Projects. In the event of any fossil discovery, regardless of depth or <br />During ground <br />Project <br />City of Santa <br />City of Santa <br />geologic formation, construction work shall halt within a 50-foot radius <br />disturbing activities <br />Applicant/ <br />Ana Building <br />Ana Building <br />of the find until its significance can be determined by a qualified <br />Developer <br />Safety Division <br />Safety <br />paleontologist. Significant fossils shall be recovered, prepared to the <br />Division <br />point of curation, identified by qualified experts, listed in a database to <br />facilitate analysis, and deposited in a designated paleontological <br />curation facility in accordance with the standards of the Society of <br />Vertebrate Paleontology (2010). The most likely repository is the <br />Natural History Museum of Los Angeles County. The repository shall <br />be identified and a curatorial arrangement shall be signed prior to <br />collection of the fossils. <br />5.7 GREENHOUSE GAS EMISSIONS <br />GHG-1 The City of Santa Ana shall update the Climate Action Plan (CAP) <br />Every five years <br />City of Santa <br />City of Santa <br />City of Santa <br />every five years to ensure the City is monitoring the plan's progress <br />Ana Building <br />Ana Building <br />Ana Building <br />toward achieving the City's greenhouse gas (GHG) reduction target <br />Safety Division in <br />Safety Division <br />Safety <br />and to require amendment if the plan is not achieving the specified <br />coordination with <br />Division <br />level. The update shall consider a trajectory consistent with the GHG <br />Project <br />emissions reduction goal established under Executive Order S-03-05 <br />Applicant/ <br />for year 2050 and the latest applicable statewide legislative GHG <br />Developer <br />emission reduction that may be in effect at the time of the CAP update <br />(e.g., Senate Bill 32 for year 2030). The CAP update shall include the <br />following: <br />October 2021 <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.