Laserfiche WebLink
GENERAL PLAN UPDATE MITIGATION MONITORING AND REPORTING PROGRAM <br />CITY OF SANTA ANA <br />Mitigation Monitoring and Reporting Program <br />Table 1-3 Mitigation Monitoring and Reporting Requirements <br />Document <br />Completion Date <br />Responsible <br />Location <br />Implementing <br />Responsible <br />(Monitoring <br />Responsible <br />Project Mitigation <br />Mitigation Measure <br />Timing <br />Party <br />Monitoring Party <br />Record) <br />Monitoring Party <br />Monitor <br />undisturbed soil. The archaeologist shall inform all construction <br />personnel prior to construction activities of the proper procedures in the <br />event of an archaeological discovery. The training shall be held in <br />conjunction with the project's initial on -site safety meeting and shall <br />explain the importance and legal basis for the protection of significant <br />archaeological resources. In the event that archaeological resources <br />(artifacts or features) are exposed during ground -disturbing activities, <br />construction activities in the immediate vicinity of the discovery shall be <br />halted while the resources are evaluated for significance by an <br />archaeologist who meets the Secretary's Standards, and tribal <br />consultation shall be conducted in the case of a tribal resource. If the <br />discovery proves to be significant, the long-term disposition of any <br />collected materials should be determined in consultation with the <br />affiliated tribe(s), where relevant; this could include curation with a <br />recognized scientific or educational repository, transfer to the tribe, or <br />respectful reinternment in an area designated by the tribe. <br />CUL-7 If an Archaeological Resources Assessment does not identify <br />Prior to <br />Project <br />City of Santa <br />City of Santa <br />potentially significant archaeological resources but the site has <br />construction <br />Applicant/ <br />Ana Building <br />Ana Building <br />moderate sensitivity for archaeological resources (Mitigation Measure <br />activities <br />Developer <br />Safety Division <br />Safety <br />CUL-4), an archaeologist who meets the Secretary's Standards shall <br />Division <br />be retained on call. The archaeologist shall inform all construction <br />personnel prior to construction activities about the proper procedures in <br />the event of an archaeological discovery. The pre -construction training <br />shall be held in conjunction with the project's initial on -site safety <br />meeting and shall explain the importance and legal basis for the <br />protection of significant archaeological resources. In the event that <br />archaeological resources (artifacts or features) are exposed during <br />ground -disturbing activities, construction activities in the immediate <br />vicinity of the discovery shall be halted while the on -call archaeologist is <br />contacted. The resource shall be evaluated for significance and tribal <br />consultation shall be conducted, in the case of a tribal resource. If the <br />discovery proves to be significant, the long-term disposition of any <br />October 2021 Page 23 <br />