<br />List of Requests to Carryover Unspent Appropriations <br />FY20‐21 Balances to FY21‐22 <br />As of August 31, 2021 <br />Accounting Carry Forward <br />Up To AmountUnitFund Description Project Description Project Status <br />05417647 SANITARY SEWER CAPITAL <br />05417647 SANITARY SEWER CAPITAL <br />05517660 SEWER CONNECTION FEE <br />WRIGHT ST SEWER MAIN IMPROVE Active ‐ Design, 90% complete 3,000,000 <br />FLOWER ST SEWER MAIN IMPROVEME <br />FLOWER ST SEWER MAIN IMPROVEME <br />WRIGHT ST SEWER MAIN IMPROVE <br />WARNER GARNSE SWR MAIN DIV IMP <br />SEGERSTROM/SAN LORENZO S LIFT <br />BAKER‐GLENWOOD SEWER <br />Active ‐ Design, 90% complete 1,000,000 <br />2,207,100 <br />74,100 <br />Active ‐ Design, 90% complete <br />05517660 SEWER CONNECTION FEE Active ‐ Design, 90% complete <br />05517660 SEWER CONNECTION FEE Active ‐ Design, 90% complete 200,000 <br />5,383,400 <br />920,100 <br />80,400 <br />05517660 SEWER CONNECTION FEE Active ‐ Construction, 25% complete <br />05517660 SEWER CONNECTION FEE Active ‐ Construction, 90% complete <br />05717640 FED CLEAN WATER PROTECTION ENT <br />05717640 FED CLEAN WATER PROTECTION ENT <br />05717640 FED CLEAN WATER PROTECTION ENT <br />05717640 FED CLEAN WATER PROTECTION ENT <br />SA DELHI CHANNEL DIVERSION <br />Warner Storm Drain Imp: Ph1 <br />Active ‐ Construction, 100% complete, negotiating claim with contractor <br />Active ‐ Construction,15% complete 600,000 <br />31,500DYER RD STORMDRAIN REPAIR <br />MISC STORMDRAIN REPAIRS <br />Inactive ‐ Construction, 100% complete. Working on project closeout. <br />Active ‐ Construction, 99% complete 142,700 <br />Active ‐ Constructed/Final, 100% Completed, Funds are passed through from <br />developer; carryforward for project reconciliation to close out the project.05917660 SELECT STREET CONSTRUCTION INSTALLATION RR ENHANCE‐DYER R 30,000 <br />05917660 SELECT STREET CONSTRUCTION <br />05917660 SELECT STREET CONSTRUCTION <br />05917660 SELECT STREET CONSTRUCTION <br />WARNER AVE WDNG:MAIN‐OAK PH I <br />WESTMNSTER REHAB:HARBR TOCLINT <br />FAIRVIEW BRDGE & STREET IMPRV <br />Active, Construction Funding, 15% complete <br />Completed; carry forward for project reconciliation to close out the project. <br />45% in the Design phase <br />2,107,700 <br />35,200 <br />570,300 <br />05917660 SELECT STREET CONSTRUCTION <br />05917660 SELECT STREET CONSTRUCTION <br />05917660 SELECT STREET CONSTRUCTION <br />05917660 SELECT STREET CONSTRUCTION <br />05917660 SELECT STREET CONSTRUCTION <br />05917660 SELECT STREET CONSTRUCTION <br />OC STREETCAR Active, Construction, 50%205,800 <br />400Inactive ‐ Construction, 100% complete. Ready for project close‐out; <br />carryforward for project reconciliationFAIRVIEW ST: SEGERSTROM TO NCL <br />WESTMINSTER REHAB:CLINTON‐FRVW <br />HAZARD AVE PROTECTED BIKE LANE <br />BRISTOL & EDINGER CLASS II BK <br />BRISTOL ST PROTECTED LN EDGR‐1 <br />Completed ‐ carryforward to reconcile 102,800 <br />113,200 <br />70,500 <br />Active ‐ Construction, 100% Completed. Working on project close‐out. <br />Anticipated completion by December 2021 <br />Active ‐ Construction, 100% Completed. Working on project close‐out. <br />Anticipated completion by December 2021 <br />Active, Construction, 90%1,264,000