My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 37 - Bristol Street and Memory Lane Intersection Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
09/07/2021 Regular
>
Item 37 - Bristol Street and Memory Lane Intersection Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:39:24 AM
Creation date
8/17/2023 1:41:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
37
Date
9/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />Value of the Remainder in the After Condition After Considering Benefits <br />Briefly stated, benefits are defined as any value enhancement resulting from the project. As cited in Los <br />Angeles County Metropolitan Transit Agency v. Continental Development Corporation, 97 Daily Journal <br />D.A.R. 11021, "...all reasonably certain, non -speculative benefits resulting from the project may offset <br />against severance damages..." <br />Although the community in general may benefit from the proposed project, we have found no evidence <br />of benefits accruing to the Remainder in the "After" condition. <br />The construction of the project in the manner proposed may bring benefits to the area in the form of <br />traffic allowance and safety, and, hence, value enhancement; however, at this time, such benefits are not <br />quantifiable. The value of the remainder in the after condition after considering benefits is not changed <br />from the value of the remainder in the after condition before considering benefits; thus, no benefits are <br />shown, as follows: <br />Benefits <br />Remainder in the After Condition After Considering Benefits $17,876,391 <br />Remainder in the After Condition Before Considering Benefits $17,876,391 <br />Benefits $0 <br />Fair Market Value of Temporary Construction Easement <br />A temporary construction easement is proposed to allow for the construction of the project as proposed. <br />A review of the proposed agreement to assess the degree of encumbrance on the property was <br />completed to ascertain which rights the fee owner retains. The impact on value may be a function of the <br />loss of utility, access and use rights to be transferred and the obligations of the parties during the <br />construction period. <br />The TCE is intended to allow the contractor onto the site to complete construction -related activities. The <br />presence of the proposed TCE appears to restrict the normal use of the area by the owner and a ground <br />rent equivalent to 100% of the market ground rental rate is indicated. <br />A temporary construction easement (TCE) reflects a transaction equivalent to a rental of the land for the <br />period of construction. It can be evaluated based on negotiated land rental transactions, or (in the <br />absence of directly relevant market transactions) a rate of return may be applied to the value of the <br />underlying land. In this appraisal, we have relied on the latter. <br />The value of the subject land encumbered by the TCE is expressed as the value per square foot based on <br />the unit value of the larger parcel. As previously discussed, it is our opinion that the fee value of the <br />subject land is at a unit rate of $70.00 per square foot. <br />An application of the appropriate value per square foot is applied to the concluded rate of return for the <br />land area affected by the temporary construction easement. For the area affected by the TCE, the <br />indicated fee value of the land rental component is calculated in the following table. <br />Temporary Construction Easement (Land Rental Component) <br />Assesor's Parcel Land Value TCE Land Annual Rate of Annual Duration Indicated <br />Number Area ($/SF) Value Return TCE Value (Years) Value <br />002-261-29 948 $70 $66,360 10% $6,636 1 $6,636 <br />Site Improvements within the TCE area <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.