Laserfiche WebLink
Award Construction Contract to iBuild Spectrum, Inc. <br />October 19, 2021 <br />Page 2 <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was <br />advertised in the Orange County Register newspaper on February 26 and March 5, 2021. <br />The project was also advertised on PlanetBids, and bids were received electronically via <br />PlanetBids on April 15, 2021. <br />The City notified a total of 580 regional vendors via PlanetBids, two of which were Santa <br />Ana based, and 52 vendors requested bidding documents. The lowest responsive bid <br />was received from a Santa Ana contractor. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />iBuild Spectrum, Inc. <br />Santa Ana <br />$1,408,575.00 <br />2 <br />HYM Engineering, Inc. <br />Fullerton <br />$1,478,200.00 <br />3 <br />C.S. Legacy Construction, Inc. <br />Chino <br />$1,541,850.00 <br />4 <br />JF Engineering <br />Pomona <br />$1,582,006.74 <br />5 <br />Aneen Construction, Inc. <br />Riverside <br />$1,643,340.00 <br />6 <br />AG Construction <br />Tarzana <br />$1,649,115.00 <br />A total of six bids were received, and all were deemed responsive. iBuild Spectrum, Inc., <br />submitted the lowest responsive base bid, in the amount of $1,408,575 (Exhibit 2). As <br />specified in the bid documents, the lowest bid shall be determined on the basis of the <br />Base Bid. Based on the bid analysis and a contractor's reference check, staff <br />recommends awarding the construction contract to iBuild Spectrum, Inc., in the amount <br />of the base bid totaling $1,408,575 (Exhibit 3). <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes: construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen conditions. <br />Construction administration and inspection includes: construction management, <br />implementation of the City's Community Workforce Agreement requirements, inspection <br />of the Contractor's work to ensure contract compliance, workmanship, and quality, and <br />materials testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized in the <br />table below, the estimated total construction delivery cost of the project is $1,640,000. <br />