My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Natural Gas Fueling Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 22 - Natural Gas Fueling Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:29 AM
Creation date
8/17/2023 4:03:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Fittings 2" and under shall be threaded malleable iron, class 150, ASTM 1197. <br />Larger fittings shall be butt weld type ASTM A234 WPB of the same wall thickness as the <br />adjoining pipe. <br />D. Flanges shall be forged steel, slip-on or weld neck. raised face, ASTM A- 1 05, <br />bored to match the I.D. of the pipe. Flange ratings shall be as required for the design <br />of the piping system. <br />E. Welding and welder qualifications shall conform to the requirements of the ASME <br />Boiler and Pressure Vessel Code or AP! Standard 1104. Filler metals shall be selected <br />in accordance with AWS or ASTM Standards. <br />F. All electrical systems for all electrical equipment shall be furnished and installed <br />on the skid. Electrical construction shall be in accordance with N FPA 52 and N FPA <br />70 for Class I, Div II, Group D. Terminal strips shall be furnished with all internal wiring <br />complete to these terminal strips. Electrical control panel(s) shall be waterproof NEMA <br />4. Power required shall be 120 Volt, I phase, 60Hz. Provide a separate grounding lug <br />on the skid. <br />G. Painting: Skid, equipment, piping and all other ferrous materials which are not <br />insulated shall be primed and painted. A minimum of one primer and two finish coats <br />are required. One quart of touch up paint to match the finish shall be furnished with the <br />equipment. <br />1.7 Instrumentation: Provide a continuous dew point monitor with selectable digital dew point <br />indication in degrees C or F at the dryer control panel. Moisture sensor shall be mounted <br />at the dryer outlet to verify the outlet gas dew point. Provide two alarm lights: one for <br />deteriorating dewpoint performance and one for regeneration required. Provide two set of <br />dry alarm contacts for a remote signal. <br />City of Santa Ana - RFP 20-095 <br />CNG Fuel Station: Design, Build, Operate and Maintain <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.