Laserfiche WebLink
Tru Star <br />Energy CNG <br />Fill Posts for 40 Time -Fill hoses - Included <br />20 dual -hose time -fill posts will be supplied and installed in the time -fill mounting system. Each single or <br />dual -hose post includes: receiver for fill hose nozzle, Heavy duty retractor for fill hose, Shut off valve, <br />Safety and Warning signs, Grounding rod with 3/8-16 grounding stud welded on with double clad <br />plated nuts. Posts are installed in a concrete base 18" in diameter and 3' in depth. Holster style post <br />hook up - eliminates freeze up of nozzle to post. Posts are constructed of 3" x 3" square steel tube with <br />on -post atmospheric gas exhaust vent, located at the top of the post. The top of the post measures 10' <br />high from mounting surface. Prepped, painted "Safety" yellow. <br />40 Fill Hoses - Included <br />• Staubli 3,600 psi NGV1 Type 2 nozzles <br />25' long hose with Guard-rail mount <br />150# inline high-pressure breakaways <br />• Swagelok 3 way valve for nozzle <br />Time -Fill Post 3 Zone Layout - Included <br />High-pressure discharge lines run from the compressor to 3 time fill zones. All lines are trenched or <br />directional drilled when possible from compressor to first fill hose on fill line. Trenched lines are replaced <br />with original surface type that existed before trenching. <br />Mechanical High Pressure Trenching per Time -Fill Run - Included <br />Trenching for mechanical high pressure originating from the compressor to each individual time fill run. <br />Time -Fill Line Filtration - Qty 1 - Included <br />There will be Parker High pressure filters installed on the beginning of the Time -Fill Line to catch any oil <br />bypass and contaminants before CNG is dispensed into the trucks. Filter stand includes a 99.5% 3/4" <br />JS3B-10 pre-coalescer filter and 1 " JS4C 99.9% final filter. <br />High -Speed Defueling Panel - Included <br />High-speed defueling panel equipped with a Parker Quick Release Coupler. Comes complete with a <br />self-supporting enclosure stand. <br />High -Pressure Piping - Included <br />Stainless steel high-pressure Time -Fill Line will be run from the compressor area to the Time -Fill Line. This <br />high-pressure line will be directional drilled when possible and where required, trenching for high- <br />pressure runs will be backfilled and replaced with like type surface material (which was removed during <br />installation). All stainless steel lines that are run underground are protected by PVC conduit. Stainless <br />steel tube is rated at 5,000 psi with 1/2" having a .065" wall thickness and 3/4" tubing having a .095" wall <br />thickness. Schedule 160 High pressure stainless steel pipe between 1 " and 2" in diameter is rated at <br />5,000 psi. <br />Low -Pressure Piping - Included <br />Low-pressure piping will be used from gas meter assembly to the inlet gas dryer and from the inlet gas <br />dryer to the compressors. Schedule 40 carbon steel is rated at over 1,000 psi. <br />Time Fill Panel - Included <br />Time fill panels with 1" valve (for applications above 700 scfm), located on compressor will control the <br />start and stop functions of the Time -Fill Line. This panel provides temperature compensation fill on the <br />Time -Fill Line. This panel also allows you to set specific start and stop times on the Time -Fill Line to <br />TruBar Energy - 10225 Phladelph is Court, Rancho Cucamonga, 91730 • 909-793-3700 • (fax) 909-793.jj()56 • www.trustirenergy.com <br />