My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - San Lorenzo Sewer Lift Station
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 24 - San Lorenzo Sewer Lift Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:47:34 AM
Creation date
8/17/2023 4:03:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
24
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br />CT TITLE: <br />rom (San Lorenzo) Sewer <br />ion Reconstruction <br />CT CATEGORY: <br />rainage/Lighting <br />ments <br />al Facilities <br />LOCATION MAP <br />N <br />CITY OF SANTA ANA FY21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruct existing sewer lift station. <br />1:0111:31110 <br />PROJECT NEED: <br />The existing wet well is too shallow, resulting in surcharging of <br />incoming sewer mains. This project is required to prevent sewer mains <br />from plugging and to prevent spills. <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 681,343 - - - - - - <br />TOTAL 681,343 - - - - - - <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />SEWER CONNECTION 681,343 - - - - - - <br />PROJECTS <br />TOTAL 681,343 - - - - - - <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Water Resources Armando Fernandez, Senior Civil Engineer 02-Aug-2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.