My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Water Well, Pump, and Motor Rehabilitation and Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 28 - Water Well, Pump, and Motor Rehabilitation and Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:53:28 AM
Creation date
8/17/2023 4:08:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
28
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope of Services & Schedule <br />General Pump Company operates a full machining / manufacturing facility and as <br />mentioned in our Statement of Qualifications - we are the only well and pump service <br />company in Southern California that builds 100% of our bowl assemblies. With our <br />sixteen (16) cranes and/or rigs along with our electrical, mechanical support, and <br />experienced operators, we have the capabilities and expertise to service the City's <br />emergency and normal maintenance. Because of our close proximity and capabilities, we <br />can usually get any emergency repair completed and back in service in one day. <br />We have more annual (with renewal option) Maintenance Contracts than all of our <br />competitors for the Southern California region. Maintenance Contracts are considered <br />our highest priority when scheduling. <br />Listed below is an example of our scheduling process for the services stated in the <br />Attachment 1: Scope of Work and upon receiving a Notice -to -Proceed. <br />• Day 1 <br />Mobilization; Pull <br />■ Day 2 <br />Prep for video. <br />• Day 3 <br />Perform video. <br />• Day 4 <br />Wire Brush (if needed) <br />• Day 5 <br />Chemical treat <br />• Day 6 <br />Bail; disposal of fill. <br />■ Day 7 <br />Sonar Jet (recommend performing prior to chemical treat. <br />Performing AirBurst® would be safer and more effective - <br />would take one day) <br />• Day 8 <br />Prep for video. <br />• Day 9 <br />Revideo <br />• Day 10 <br />Clean up site; demobilize. <br />• Days 11-15 <br />During this process we will be waiting for materials. Schedule <br />assumes materials will arrive within ten (10) days or less. Allow <br />two (2) days to inspect and assemble (Shop). Including Motor <br />Repair Services <br />• Day 16 <br />Install pump. <br />• Day 17 <br />Startup and testing. <br />** If you perform the factory bowl testing they are anoting 6-8 weeks* <br />