My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - Design Services for the Standard — McFadden Park Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 30 - Design Services for the Standard — McFadden Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:56:39 AM
Creation date
8/17/2023 4:11:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amount from each payment until the completed Project has been accepted by the City. <br />Each invoice must include a Consultant Progress Report that contains tasks and activities <br />completed and summary of work in the next month period. Certificate of insurance must be <br />current in order for invoices to be processed. <br />CITY RESPONSIBILITIES: <br />The City will provide information in its possession relevant to the preparation of the required <br />information in the RFP. The City will provide only the staff assistance and the documentation <br />specifically in referred to herein. <br />• City staff will be responsible for the General Plan Amendment from Low Density <br />Residential (LR-7) to Open Space (0), an Amendment Application to change the zoning <br />district from Multi -Family Residence (R3) to Open Space Land (0) and the lot merger <br />process. <br />• Furnish scope of work and provide general direction as needed for the assigned project. <br />• All plan check coordination within the City <br />• Advertise, award, and administer of construction contract <br />• Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards) <br />• Electronic files for title sheets and sheet borders <br />• Facilitate meeting space and coordination and City facilities <br />CONSULTANT RESPONSIBILITIES: <br />• Provide all required insurance as outlined in Attachment 2 of this RFP. <br />• Submit renewal of Certificate of Insurance 30 days before expiring. <br />• Ensure Certificate of Insurance is current when submitting invoices. <br />City of Santa Ana RFP 21-055 <br />Page Al-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.