Laserfiche WebLink
Proposal to provide <br />Landscape Architectural Design for Standard -McFadden Park - RFP No. 21-055 <br />Todd Holmes, PLA 3561, PMP <br />Quality Assurance/Quality Control / Public Outreach <br />Education <br />BS, Landscape Architecture, 1988, California State Polytechnic <br />University, Pomona <br />Registration <br />Professional Landscape Architect, California (3561), 1991 <br />Registered Landscape Architect, Nevada (#1070), 2021 <br />Project Management Professional (#1878299), 2015 <br />Years of Experience <br />33 <br />Todd is a California licensed landscape architect with <br />extensive experience in the public sector throughout <br />Southern California. For the past 33 years, he has <br />been responsible for the design and management of <br />a wide variety of projects including neighborhood and <br />community parks, trails, campgrounds, streetscapes, <br />restroom facilities and recreation centers. Todd has <br />also been involved in significant and successful public <br />outreach efforts during his career. <br />La Pintoresca Park, Pasadena, California <br />Under the direction of Todd Holmes, DEA provided <br />landscape architectural services for the renovation <br />of La Pintoresca Park in the City of Pasadena. This <br />project will replace existing facilities and add new <br />amenities to the park. New features include a splash <br />pad for water play, new lighting for the skate park <br />and basketball courts, replacement of aged fencing <br />with new decorative fencing, installation of a new <br />shade structure over the playground, correcting <br />drainage problems and court resurfacing. The project <br />also included community meetings and construction <br />support. <br />Jackson and Kenner Memorial Park, Indio, <br />California <br />Todd provided quality assurance / quality control for <br />the development of a community park on two -acres <br />of land in the City of Indio. DEA prepared conceptual <br />and final construction plans, and collaborated with <br />the City and the community to enhance the concepts <br />through community input. <br />Robinson Park, Pasadena, California <br />Todd served as landscape architect for the complete <br />redesign of Robinson Park, a community park <br />located in Pasadena. The project was driven by <br />extensive community engagement and a lengthy <br />workshop process that resulted in a final design with <br />strong community support. The project included the <br />replacement of the existing obsolete community <br />center with a new multi -purpose recreational facility. <br />The park was expanded by acquisition of an adjacent <br />property to allow construction of a new synthetic turf <br />football and baseball fields, restrooms and parking. <br />A new playground, picnic area and landscape areas <br />were also included in the final design. <br />Reese's Retreat Playground, Brookside Park, <br />Pasadena, California <br />As project leader, Todd worked with Shane's <br />Inspiration (a non-profit group with a mission to <br />create inclusive playgrounds and programs that <br />unite children of all abilities) to obtain a one -million <br />dollar grant from the State of California to design and <br />construct a large inclusive playground in Brookside <br />Park in Pasadena. Todd worked closely with <br />community members, including the City's Accessibility <br />and Disability Commission, to create a playground <br />design that fit the needs of the residents and was well <br />suited to the chosen site in one of Pasadena's most <br />prominent parks. <br />Washington Park Community House, Pasadena, <br />California <br />DEA was a critical part of a multidisciplinary design <br />team that created plans for a new multipurpose <br />building in a historic park in the City of Pasadena. <br />Todd has been engaged in the park design for almost <br />20 years and was responsible for the development <br />of the park's master plan, in addition to managing a <br />major renovation of the park. This project required <br />extensive community engagement and Todd's <br />background with the community played a significant <br />role in the success of the project. The exterior spaces <br />around the building were designed to be used for <br />programing that would integrate both interior and <br />exterior activities. The DEA team developed 3D <br />graphics to guide the design process and enable the <br />project stakeholders to visualize the project's features. <br />This project required extensive collaboration with the <br />project's architect and civil engineer as the site was <br />constrained and presented several challenges that <br />had to be overcome to achieve a successful design. <br />Appendix A - 4 1 June 1, 2021 1 David Evans and Associates, Inc. <br />