My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - Design Services for the Standard — McFadden Park Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
08/17/2021 Regular
>
Item 30 - Design Services for the Standard — McFadden Park Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 11:56:39 AM
Creation date
8/17/2023 4:11:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
30
Date
8/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit C <br />StandardCitY of Santa Ana <br />McFadden <br />Project Schedule <br />Task & PM/LA Q. PME IDE ENG ECAD HYENG SID SILD LCAD ADM SVY GEO EE SPHON Total <br />00 <br />1 <br />Pre-Design/Start Up Meeting <br />6 <br />6 <br />$ 2,280 <br />$ 100 <br />2 <br />Conceptual Plan 30% , 3D Exhibit / Final Schedule <br />24 <br />6 <br />2 <br />12 <br />4 <br />6 <br />20 <br />60 <br />2 <br />$ 2,600 <br />$ 21,130 <br />$ 250 <br />3A <br />Topographic Survey <br />2 <br />2 <br />$ 10,500 <br />$ 11,190 <br />$ 100 <br />3B <br />Record Mapping <br />$ 7,500 <br />$ 7,500 <br />$ 100 <br />4 <br />Gootechnical Investigation and Report <br />2 <br />1 <br />$18,500 <br />$ 19,055 <br />$ 100 <br />5 <br />Preliminary Hydrology and Hydraulics Analysis <br />2 <br />2 <br />2 <br />24 <br />8 <br />40 <br />1 <br />1 <br />1 <br />1 <br />1$ 13,410 <br />$ 100 <br />6 <br />Public Outreach and Project Meetings <br />32 <br />12 <br />1 <br />1 16 <br />1 24 <br />1 <br />J$ 15,040 <br />$ 300 <br />7 <br />Design Development Plans 60% <br />24 <br />8 <br />2 <br />40 <br />24 <br />24 <br />36 <br />40 <br />2 <br />$ 5,500 <br />$ 34,910 <br />$ 300 <br />8 <br />Final Construction Documents (90%-100%) <br />8.1 <br />Site Plan <br />8 <br />6 <br />8 <br />30 <br />2 <br />$ 6,980 <br />$ 100 <br />8.2 <br />Site Utility Plan and Coordination <br />2 <br />2 <br />2 <br />12 <br />14 <br />4 <br />2 <br />$ 4,990 <br />$ 10,980 <br />$ 100 <br />8.3 <br />Horizontal Control Plans <br />2 <br />2 <br />1 <br />8 <br />12 <br />4 <br />2 <br />$ 4,805 <br />S 100 <br />8.4 <br />Grading and Drainage Plans <br />2 <br />2 <br />2 <br />24 <br />40 <br />6 <br />2 <br />$ 12,450 <br />S 100 <br />8.5 <br />Alley Improvement Plans <br />1 <br />2 <br />2 <br />16 <br />32 <br />8 <br />$ 9,515 <br />$ 100 <br />8.6 <br />WQMP <br />1 <br />1 <br />2 <br />16 <br />24 <br />2 <br />$ 7,570 <br />$ 300 <br />8.7 <br />Erosion Control Plan <br />1 <br />1 <br />2 <br />8 <br />4 <br />2 <br />$ 2,620 <br />$ 100 <br />8.8 <br />Site Amenities Plan <br />16 <br />2 <br />16 <br />36 <br />2 <br />$ 9,390 <br />$ 100 <br />8.9 <br />Skate Park Plan <br />6 <br />2 <br />6 <br />$ 9,000 <br />$ 11,050 <br />$ 100 <br />8.10 <br />Planting Plan <br />4 <br />2 <br />4 <br />32 <br />$ 4,990 <br />$ 100 <br />8.11 <br />Irrigation Plan <br />4 <br />2 <br />1 <br />1 <br />24 <br />40 <br />2 <br />$ 8,950 <br />$ 100 <br />8.12 <br />Electrical Plans <br />4 <br />1 <br />1 <br />1 <br />5,760 <br />$ 6,645 <br />$ 100 <br />8.13 <br />Construction Details <br />8 <br />2 <br />2 <br />2 <br />8 <br />4 <br />8 <br />12 <br />24 <br />2 <br />$ 9,800 <br />$ 100 <br />8.14 <br />Technical Specifications <br />8 <br />4 <br />8 <br />10 <br />4 <br />10 <br />6 <br />$ 7,440 <br />$ 50 <br />8.15 <br />Independent Final Opinion of Probable Cost <br />3 <br />2 <br />2 <br />2 <br />8 <br />10 <br />2 <br />10 <br />$ 5,625 <br />$ 25 <br />8.16 <br />Plan Submittals, Approval Process, and Permitting <br />8 <br />2 1 <br />4 <br />8 <br />12 <br />4 <br />12 <br />2 <br />$ 7,710 <br />$ 300 <br />8.17 <br />Final Colored Rendering <br />2 <br />1 <br />4 <br />24 <br />$ 3,615 <br />$ 200 <br />Optional Tasks I Construction <br />9 Bid Advertisement <br />6 <br />4 <br />2 <br />2 <br />4 <br />2 <br />$ 3,260 <br />$ 150 <br />10 Construction Administration <br />16 <br />4 <br />16 <br />4 <br />8 <br />2 <br />6 <br />$ 9,570 <br />$ 500 <br />11 As Built Plans <br />3 <br />2 <br />1 <br />2 <br />8 <br />6 <br />4 <br />'6 <br />$ 5,750 <br />$ 250 <br />Please note that scope and fee are negotiable. <br />Reimbursables included for budgetary purposes only. <br />Greyed out areas are not included in the total cost. <br />Total Tasks 1-8.17 <br />$ <br />254,650 <br />$ 3,425 <br />Optional Tasks 9-11 <br />$ <br />18,580 <br />$ 900 <br />Grand Total <br />$ <br />273,230 <br />$ 4,325 <br />FD <br />AVID EVANS <br />AND ASSOCIATES INC <br />
The URL can be used to link to this page
Your browser does not support the video tag.