My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Sewer System Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 13 - Sewer System Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:05:56 PM
Creation date
8/17/2023 5:13:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Public Works Agency <br />RFP No.: 21-036 — Sewer System Repair Services -r:; <br />RELEVANT CONSTRUCTION PROJECTS COMPLETED <br />Protect #1: <br />Project Name: CSUSB Infrastructure Upgrades- Housing & Campus Phase 1 & 4 <br />Location: San Bernardino, CA <br />Owner: Trustees of the California State University <br />Owner Contact (name and current phone number): <br />Chris Myers, Project Manager (949) 648-3466 <br />Architect or Engineer: <br />P2S Engineering, Inc. <br />Architect or Engineer Contact (name and current phone number): <br />Charlotte Dean (562) 497-2999 <br />Construction Manager Contact (name and current phone number): <br />Chris Myers, Project Manager (909) 648-3466 <br />Description of Project, Scope of Work Performed: <br />Perform upgrades of all underground utilities throughout campus. The project included <br />furnishing and installing new hot and chilled water hydronic piping, underground piping <br />vault sewer, storm drain, and water utilities. <br />Total Value of Construction (including change orders): $7,910,100 <br />Original Scheduled Completion Date: August 2018 <br />Time Extensions Granted (number of days): zero days <br />Actual Date of Completion: August 2018 <br />W. A. R AS1C C�RSTHIICTIdH <br />
The URL can be used to link to this page
Your browser does not support the video tag.