My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Water Supply Assessment for the Warner - Red Hill Mixed Use Development Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 21 - Water Supply Assessment for the Warner - Red Hill Mixed Use Development Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 5:20:38 PM
Creation date
8/17/2023 5:20:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T HE W ARNER P ROJECT <br />W ATER S UPPLY A SSESSMENT A UGUST 21, 2020 <br />F USCOE E NGINEERING , I NC. 8 <br />2.1.1 Existing Water Use <br />As mentioned, the existing land use of the Project include office, warehousing, industrial, and a <br />temporary homeless shelter. There are currently three buildings that occupy approximately <br />160,400 SF at the Project site. See Figure 2 for an aerial image of the existing land uses at the <br />proposed Project site. <br /> <br />The water demand factors from the City of Santa Ana Design Guidelines for Water and Sewer <br />Facilities (March 2017)2 were utilized to establish an estimate of existing water demands at the <br />Project site. An industrial water demand factor of 3,500 gallons per day (gpd) per acre was <br />employed to account for three existing buildings at the Project site. In addition, a landscape <br />water demand factor of 3,000 gpd/acre was employed for the scattered landscaping at the <br />Project site. See Table 2 below for estimated existing water demands and the Project site. <br /> <br />Table 2 Existing Water Demands <br />Existing Land <br />Use <br />Land Use <br />Square <br />Footage <br />Land Use <br />Acreage <br />Water Demand Factor <br />(gpd/acre) <br />Existing Water <br />Demand <br />(gpd) <br />Existing Water <br />Demand (AFY) <br />Industrial Land <br />Uses 160,400 3.68 2,500 9,200 10.3 <br />Landscaped <br />Area 60,000 1.40 3,000 4,200 4.7 <br />Total 220,400 5.08 -- 13,400 15.0 <br />Notes: <br />gpd gallons per day AFY acre-feet per year <br /> <br />As shown above, the estimated existing water use at the Project site is approximately 13,400 <br />gallons per day (gpd) or 15.0 acre-feet per year (AFY). An estimated annual difference between <br />existing water demands and proposed water demands resulting from the proposed Project are <br />calculated and shown in Section 2.1.2. <br /> <br /> <br />2 City of Santa Ana Design Guidelines for Water and Sewer Facilities (March 2017). Found here: <br />http://www.santa-ana.org/pwa/documents/DesignGuidelines.pdf
The URL can be used to link to this page
Your browser does not support the video tag.