My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Water Supply Assessment for the Warner - Red Hill Mixed Use Development Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 21 - Water Supply Assessment for the Warner - Red Hill Mixed Use Development Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 5:20:38 PM
Creation date
8/17/2023 5:20:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T HE W ARNER P ROJECT <br />W ATER S UPPLY A SSESSMENT A UGUST 21, 2020 <br />F USCOE E NGINEERING , I NC. 27 <br />5. C ONCLUSION <br />The City of Santa Ana depends on local and regional water supplies from Metropolitan to satisfy <br />growing demands. OCWD has managed the OC Basin for over 75 years and has plans to <br />sustainably manage the groundwater system through 2040 under the new California SGMA <br />policies and guidelines. Metropolitan has stated in its 2015 UWMP that its water supply <br />portfolio will be able to satisfy regional growth and water demands through 2040. The same <br />findings were concluded in the City of Santa Ana 2015 UWMP as both Metropolitan and <br />groundwater supplies are projected to meet future water demands. <br /> <br />The 2015 City UWMP projected that water demands would grow from 37,008 AF in 2015 to <br />40,036 AF in 2040. Over the past several years, actual demand has substantially decreased <br />due to local conservation and regional drought management regulations. Therefore, like most <br />UWMPs, the 2015 City UWMP is conservative with projections of water supplies needed to <br />satisfy demands through 2040. <br /> <br />2015 UWMP incorporates regional growth projections from CDR in order to determine future <br />water demands. Projects like the Warner are included in these regional projections of future <br />population growth and are tracked by the City. The proposed Project will demand <br />approximately 269 AF per year (an increase of approximately 254 AF per year as compared to <br />existing water demands which is well within the planned water supplies needed in the future in <br />the City of Santa Ana. Therefore, this WSA is able to conclude adequate supplies are available <br />to provide for the demands of the proposed Project as well as other service area demands within <br />the City of Santa Ana. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.