My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - Water Supply Assessment for the Warner - Red Hill Mixed Use Development Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/20/2021 Regular
>
Item 21 - Water Supply Assessment for the Warner - Red Hill Mixed Use Development Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2023 5:20:38 PM
Creation date
8/17/2023 5:20:04 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M:\Landscape\CA Friendly Landscape Guideline May272015REV.doc <br /> <br /> <br /> <br />Sample of landscape planting and permeable hardscape <br /> <br /> <br /> Permeable Hardscape <br />(35% maximum) <br />Single Family Residences (R1 zoning district) requires: 20 feet landscape setback <br />for front yard; to include one 24-inch box canopy tree, six 5-gallon shrubs, ten 1-gallon <br />shrubs (SAMC 41-240) and “ground cover” (per 2014 City California Friendly <br />Landscape Guideline). A five feet landscape setback is also required for side yards, <br />with the exception of approved walkway or driveway. <br />Landscape Plants <br />(65% minimum) <br />20 Feet
The URL can be used to link to this page
Your browser does not support the video tag.