Laserfiche WebLink
Rainbow Crosswalks in Downtown Santa Ana <br />July 20, 2021 <br />Page 6 <br />1 <br />9 <br />0 <br />7 <br />The $8,000 cost estimate includes a durable application material that lasts longer <br />than traditional paint. <br />Staff has identified the crosswalks on Broadway at 2nd Street as a possible <br />location to install rainbow crosswalks. <br />The design would need to comply with the California Manual on Uniform Traffic <br />Control Devices (CA MUTCD) requirements, which, among other specifications, <br />require that the white outer lines remain. <br />The installation is expected to last three to five years, with a yearly maintenance <br />cost estimate of $1,500. <br />Next Steps <br />At this time, staff requests direction from the City Council relating to a proposal to install <br />rainbow crosswalks in Downtown Santa Ana. <br />FISCAL IMPACT <br />There is no fiscal impact associated with this action. <br />Submitted By: Kristine Ridge, City Manager <br />Approved By: Kristine Ridge, City Manager