Laserfiche WebLink
RFP #21-017: On-Call Environmental Review Services for the <br />Housing Division <br /> City of Santa Ana Community Development Agency <br /> <br />A-24 <br /> 63675 <br /> <br />22-Unit Condominium Project, Environmental Impact Report, La Puente, CA <br />Environmental Planner. Eunice worked on preparation of CEQA documentation for the 22-unit condominium project <br />that would include the demolition of a historic theater. The Project included technical analysis for air quality, <br />greenhouse gas emissions, and a historical assessment. <br />Civic Center Building 16 Demolition Initial Study/Mitigated Negative Declaration, Orange County <br />Public Works, Santa Ana, CA <br />Assistant Planner. Eunice assisted the preparation of an IS/MND and the MMRP for the demolition of Building 16, <br />within the Orange County Civic Center. Due to project schedule concerns, the administrative draft of the IS/MND was <br />prepared in only 1.5 weeks from receipt of notice to proceed. Due to the age of the building required a full historic <br />resources assessment was conducted. <br />Avalon K-12 Site Improvements Project, Long Beach Unified School District (LBUSD), Long Beach, Los <br />Angeles County, CA <br />Environmental Planner. Eunice drafted the Initial Study Checklist and assisted the Project Manager in incorporating <br />the technical studies into the Initial Study. The Avalon K-12 Site Improvement project includes installation of HVAC on <br />campus, replacement of the natural turf baseball field with artificial turf, and various other campus-wide <br />improvements. Due to the presence of contaminated soils, the CEQA analysis is also including the contaminated soils <br />removal in the analysis. Technical analysis is being prepared including air quality and GHG analysis, noise assessment, <br />geohazards assessment, and historical resources analysis. <br />Washington Middle School HVAC and Track & Field Improvements, Long Beach Unified School <br />District (LBUSD), Long Beach, Los Angeles County, CA <br />Project Manager. Eunice prepared the Initial Study checklist to confirm the appropriate CEQA documentation for the <br />HVAC improvements and turf replacement at Washington Middle School. The improvements included accessibility <br />upgrades as required to meet ADA requirements, utility upgrades, and replacement and repairs for the interior and <br />exterior buildings. The project also included preparation of a Historic Resources Assessment because the school was <br />listed eligible for the National Register of Historic Places, and the Administration Building and Science and Shop Building <br />are considered character defining features. <br />Superior Avenue Pedestrian and Bicycle Bridge, Newport Beach, Orange County, CA <br />Environmental Planner. Chambers Group is working with the City of Newport Beach in the construction of a pedestrian <br />and bicycle bridge overcrossing Superior Avenue, a new larger parking lot with a range of 100 to 128 parking spaces <br />and a fenced dog park on an approximately 3.4-acre site in the City of Newport Beach. The proposed bridge will connect <br />Sunset Ridge Park to the new asphalt parking lot located at the northeast corner of West Coast Highway and Superior <br />Avenue. Due to the location of the project and being partially funded by federal funding, Chambers Group is responsible <br />for preparing CEQA documentation, NEPA documentation and California Coastal Development Permits for the project. <br />Technical Studies (air quality, GHG emissions, energy and noise analyses, initial site assessments, hazardous materials <br />analysis, Coastal California Gnatcatcher focused surveys, visual assessment) and a subsequent IS/MND were prepared <br />as an appropriate CEQA documentation to provide the public and responsible agencies with information about the <br />potential environmental impacts associated with implementation of the proposed Project. This IS/MND includes a <br />project-level analysis of the potential effects associated with the Project. As a part of the NEPA documentation, <br />Chambers Group was responsible for coordination with the Caltrans Local District and the resulting preparation of a <br />Categorical Exclusion as the appropriate form of NEPA documentation. <br /> <br />EXHIBIT 2