Laserfiche WebLink
Relevant Experience <br /> <br />Rincon Consultants, Inc. 19 <br />Westview Housing Project IS-MND <br />City of Santa Ana <br />Reference Info: <br />Selena Kelaher, AICP, Associate Planner <br />City of Santa Ana Planning and Building Agency <br />20 Civic Center Plaza, Ross Annex M-20 <br />Santa Ana, California 92702 <br />714-667-2740 | SKelaher@santa-ana.org <br />Dates: September 2020 to February 2021 <br />Budget: $47,247 <br />Scope of Work: <br /> Preparation of CEQA IS-MND <br /> Preparation of the NEPA EA <br /> Preparation a Cultural Resources Assessment <br />Staff: Deanna Hansen (Principal-in-Charge), <br />Susanne Huerta (Project Manager), Vanessa <br />Villanueva (Assistant Project Manager) <br />The Westview Residential Project involved <br />the construction of three, three- and four- <br />story residential buildings consisting of 85 <br />affordable housing units as well as indoor <br />common areas for community space, open <br />space areas, and 144 surface parking <br />spaces. The project site is approximately <br />92,400 square feet (2.12 acres) located at <br />2514 and 2534 Westminster Avenue. The <br />City’s General Plan land use designation <br />for the site was General Commercial (GC), <br />and the zoning was Commercial General <br />(C2). The site was vacant, although a portion of the site was paved and used as a parking lot. The project <br />required the approval of a General Plan Amendment to change the land use designated to Urban <br />Neighborhood (UN), and an Amendment Application was required to allow a zone change to Specific <br />Development. <br />First American Mixed-Use Project EIR Addendum <br />City of Santa Ana <br />Reference Info: <br />Ali Pezashkpour, AICP, Senior Planner <br />City of Santa Ana, Planning Division <br />20 Civic Center Plaza, M-20 <br />Santa Ana, California 92702 <br />714-647-5882 | APezashkpour@santa-ana.org <br />Dates: April 2019 to January 2020 <br />Budget: $66,433 <br />Scope of Work: <br /> Preparation of technical studies <br /> Preparation of EIR Addendum <br />Staff: Deanna Hansen (Principal), Susanne <br />Huerta (Project Manager), Steven Treffers <br />(Senior Architectural Historian), Vanessa <br />Villanueva (Planner) <br />EXHIBIT 1