My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - On -Call Material Testing and Special Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
Item 21 - On -Call Material Testing and Special Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:29:33 PM
Creation date
8/21/2023 3:49:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ Submit a final report to the City within five working days upon completion of each project. <br />B. SPECIAL REQUIREMENTS <br />Since some of the city projects will be funded by Federal or State grants, the selected consulting firm must <br />comply with requirements of Caltrans' construction manual and the following: <br />Certificate of Personnel <br />♦ The personnel who will conduct the sampling and testing must be certified. They can be <br />certified by Caltrans' District Materials Engineer, by the National Institute Certification of <br />Engineering Technologies, or by other authority acceptable by the Construction Engineer <br />of the City to be proficient in accepting sampling and testing. <br />♦ A copy of each person's certificate must be on file in the office of the Construction <br />Engineer. The certificate shall list the type of work which the individual is authorized to <br />perform. <br />♦ The testing laboratory must be under the supervision of a registered engineer with <br />experience in inspection and testing of construction materials. This engineer shall certify <br />the results of all tests performed by the lab personnel under his/her supervision. <br />♦ The selected firm must maintain the laboratory testing equipment in accordance with <br />recognized national standards. <br />♦ The selected firm must have an independent assurance testing and sampling program. This <br />program can be performed either by their own personnel not involved in the acceptance <br />testing and sampling, or by another quality assurance organization. <br />♦ Correlation Testing Program: The Materials Laboratory shall be a participant in one or <br />more of the following testing programs: <br />♦ AASHTO Materials Reference Laboratory (ARML) <br />♦ Cement and Concrete Reference Laboratory (CCRL) <br />♦ Caltrans' Reference Samples Program (RSP) <br />Acceptance Testing and Sampling <br />♦ The selected testing laboratory shall conduct acceptance testing of materials on the first day <br />when work is performed, and continues daily until the work is completed. <br />City of Santa Ana RFP 20-111 <br />Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.