My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - On -Call Material Testing and Special Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
Item 21 - On -Call Material Testing and Special Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:29:33 PM
Creation date
8/21/2023 3:49:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELEVANT PROJECT EXPERIENCE <br />b J 11R NOT" <br />f <br />V i <br />r� t <br />ef <br />wl- <br />NFL,- <br />RMA Group <br />Every Project Matters I www. rmocomponies.com <br />FOX STREET TANK PROJECT I PERRIS, CA <br />Owner: Eastern Municipal Water District (EMWD) <br />Contact: Fermin Balvaneda 1951.928.3777 <br />Project Status: 2016 - 2019 <br />Construction Cost: $3.5 Million <br />Part of RMA Group's on -call contract with EMWD, we provided grading <br />observation and testing, special inspection of reinforced concrete <br />construction, and other lab testing as needed for this 1MG tank installation <br />and valve/pipeline connection project. <br />NEW WATER QUALITY LABORATORY I CHINO, CA <br />Owner: Inland Empire Utilities Agency <br />Contact: Jerry Burke 1909.993.1548 <br />Project Status: 2016 - 2018 <br />Construction Cost: $17.8 Million <br />RMA Group observed and approved the preparation of existing ground, <br />observed placement, processing and compaction of fills, performed field <br />compaction tests of the processed existing ground and fills, laboratory testing <br />on soils, and prepared a comprehensive geotechnical report for this project. <br />PITCHESS DETENTION FACILITY RENOVATIONS/ <br />IMPROVEMENTS I LOS ANGELES, CA <br />Owner: County of Los Angeles <br />Contact: Greg Johnson 1 626.458.1741 <br />Project Status: 2019 - 2020 <br />Construction Cost: $15.5 Million <br />RMA Group provided soils inspection and testing for excavation and backfill <br />and special inspections and testing for reinforced concrete, masonry, steel <br />fabrication, and anchor installation for this jail renovation project. <br />PHILLIPS RANCH ROAD / SR60 IMPROVEMENTS I POMONA, CA <br />Owner: City of Pomona <br />Contact: Matt Pilar 1909.620.2261 <br />Project Status: 2019 - 2020 <br />Construction Cost (total project): $107 Million <br />RMA Group provided soils compaction testingforthe backfill of subgrade soils <br />for the replacement concrete ramps, curbs, gutters, and sidewalks within the <br />Caltrans right-of-way, part of an overall SR60 improvement project. <br />CAMERON AVENUE PAVEMENT REHAB I WEST COVINA, CA <br />Owner: City of West Covina <br />Contact: Miguel Hernandez 1 626.939.8400 <br />Project Status: 2018 <br />Construction Cost: $950,000 <br />RMA Group provided construction inspection and testing for quality control <br />of the pavement rehabilitation conducted installing rubberized asphalt <br />concrete, repairing damaged curbs, gutters, and sidewalks, adjusting ramps, <br />and all appurtenant work. <br />RFP NO: 20-111 I MATERIALS TESTING & SPECIAL INSPECTION SERVICES I <br />CITY OF SANTA ANA 120-1600-P I SEPTEMBER 30, 2020 Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.