My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - On -Call Material Testing and Special Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
Item 21 - On -Call Material Testing and Special Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:29:33 PM
Creation date
8/21/2023 3:49:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AESCO <br />AESCO Proposal No. P6513 <br />Statement of Qualifications <br />405 Freeway Widening JBetween SR-73 and I-605 Freeway, <br />Orange County, CA-Caltrans <br />AESCO is performing the Quality Verification _ <br />materials testing and inspection during widening of o e� <br />the 405 Freeway between Euclid Street and the 605 ; <br />Freeway, a total of 16 miles. The widening project <br />includes the construction of new lanes on the �'i` b <br />southbound and northbound sides, new retaining <br />walls, bridges, etc. The testing and inspection <br />services included a review of the concrete mix designs, concrete testing and inspection, concrete <br />batch plant inspection, pile inspection and logging, rebar inspection, aggregate testing, welding <br />inspection, subgrade testing and inspection, base material evaluation and testing, compaction testing <br />and inspection, and asphaltic concrete testing. AESCO also prepared the Quality Manual for the <br />project including all forms. An Aerially Deposited Lead (ADL) study was also performed. <br />Project Highlights: <br />• Construction Materials and Soils Inspection and Testing for Freeway Widening Project <br />• Prepared Quality Control Manual for the project <br />• Coordinating and managing construction materials testing and inspection services <br />• Environmental Sampling of Aerially Deposited Lead (ADL) <br />• Asbestos Survey and Abatement Oversight <br />• Environmental assessment of clean import and hydrocarbon impacted soils <br />• Geotechnical Engineering for retaining walls and corrosivity <br />Project Challenges: <br />• AESCO provided resolutions to non-conformance reports (NCR) related to quality issues during <br />construction in a timely manner to keep the project on schedule. Provided corrective actions to be <br />taken and measures to prevent future NCR's. <br />AESCO provided complete documentation and research associated with any NCR (specifications, <br />standards, and list of procedures) that were affected by the issue. AESCO recommended mitigation <br />measures and action plans to resolve any NCR's. <br />AESCO worked closely with the design -build team to prevent future NCR's from occurring. <br />Start Date: 2018 <br />Completion Date: 2023 (Projected) <br />Total Cost: $1.9 billion <br />Client: OC 405 Partners <br />Role: QC Inspection and Testing <br />Key Personnel Involved: Adam Chamaa, P.E., G.E., Russ Scharlin, P.E., G.E., Debra Perez, Omar Chamaa, <br />Giovanni Mikhail, Chris Sobek, David Ryan, P.E. <br />Reference <br />Reem Hashem, Principal Contracts Administrator I OCTA 1 550 South Main Street, Orange, CA 92868 <br />1 Phone: (714) 560-5446 1 E-mail: Rhashem@octa.net <br />Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering Services 131 Page 6 a C 2 d L a 9 4 m e z L c a <br />www.AescoTech.com 57z a M % 4 e CL z o a a d V /a <br />
The URL can be used to link to this page
Your browser does not support the video tag.