Laserfiche WebLink
AESCO <br />AESCO Proposal No. P6513 <br />Statement of Qualifications <br />Omar Chamaa <br />r-------------, <br />Inspector and Field Engineer, E.I.T. <br />i Education: i <br />, <br />Mr. Omar Chamaa has over 15 years of experience in the field and in laboratory testing <br />I California State <br />and inspection of construction materials such as concrete, steel, anchors, soils and <br />University, Long <br />grading. Mr. Chamaa has performed construction materials testing and inspections for <br />Beach. B.S. Civil <br />i , <br />multiple Caltrans and OCTA projects, which included bridges, roadways, utilities, <br />Engineering, 2009. , <br />foundations, pipeline installations, lift stations and retaining wall construction. Mr.' <br />' <br />� Professional i <br />Chamaa was responsible for construction material approval, such as: select fill, <br />Certifications: <br />foundation excavation, slope cut, steel installation, and concrete mix design for various <br />EIT ' <br />projects. He attended construction meetings to discuss material approvals, deficiencies, <br />, ICC Certified <br />modifications, as well as providing final observation reports to the client. <br />; Concrete Inspector <br />' CalTrans ' <br />Specific Project Experience <br />Certificate of <br />Widening of the I-405 Freeway, Euclid St. to I-605-Orange County, CA <br />' <br />Proficiency, � <br />Project Manager: Mr. Chamaa is the Project Manager for the Quality Verification <br />; Flexural Strength <br />materials testing and inspection during widening of the 1-405 Freeway between Euclid <br />of PCC, Grading, , <br />Street and the 1-605 Freeway, a total of 16 miles, for OCTA and Caltrans. The widening <br />Compressive ' <br />project includes construction of new lanes on the southbound and northbound sides, <br />, Strength, Concrete <br />retaining walls, bridges, etc. The testing and inspection services include a review of <br />i Curing, Making , <br />Beams, Rapid Set <br />concrete mix designs, concrete testing and inspection, concrete batch plant inspection, <br />Concrete, etc. <br />pile inspection and logging, rebar inspection, aggregate testing, welding inspection, <br />; City of Newport <br />subgrade testing and inspection, base material evaluation and testing, compaction testing <br />Beach Registered <br />and inspection, and asphaltic concrete testing. Mr. Chamaa also prepared the Quality <br />Deputy Building i <br />Manual for the project including all forms. <br />i Inspector <br />City of Garden <br />First Street Bridge Replacement -City of Santa Ana <br />Grove Registered <br />Inspector: Mr. Chamaa was the Inspector for the construction materials testing and <br />De � <br />p �' Building <br />ng ' <br />inspections during the replacement of the bridge. Geotechnical services consisted of pile <br />' Inspector <br />� <br />driving parameters evaluation and selection of fill materials. Testing and inspections <br />i ACI Certified, i <br />, <br />were conducted on piles, welding, structural steel, precast concrete, concrete, asphalt, <br />, <br />Concrete Field , <br />Testing Technician � <br />mix designs, etc. <br />ACI Certified, <br />Concrete ' <br />Warner Avenue Gravity Sewer Lift Station C - City of Huntington Beach, CA <br />Laboratory Testing � <br />Field Engineer. Mr. Chamaa was the Field Engineer for the construction materials testing <br />i Technician <br />and inspection and for the geotechnical and environmental Phase 11 investigations for a <br />City of Long <br />new lift station facility. The project consisted of the replacement of the existing Lift <br />Beach Registered i <br />Stations B and C and the Sunset Beach Sanitary Lift Station with a new Lift Station C. The <br />i Deputy building <br />submersible lift station incorporated a 14 foot by 26 foot by 22 foot deep wet well. The <br />; Inspector <br />bottom of the well foundation was approximately 26 to 27 feet below existing grade. The <br />City of Riverside <br />new lift station also included an 8-foot deep valve vault which was 15 feet by 10 feet in <br />Registered Deputy <br />plan dimension, a 60 kW outdoor generator, and electrical panels. <br />Inspector <br />Certified Radiation i <br />14-Inch Water Line Installation under Huntington Harbor Channel -City of <br />SafetyandNuclear <br />Gage <br />Huntington Beach, CA <br />- - - - - - - - - - - - -! <br />Field Engineer: Mr. Chamaa was the Field Engineer for a geotechnical investigation <br />for a new 14-inch <br />diameter water line composed of High Density Polyethylene (HDPE) pipe. The length of the new pipe ranged <br />from 750 feet to 950 feet. The pipe was installed beneath the Huntington Harbor bottom which is at an <br />approximate depth of 20 feet below high sea level. The water line connected to existing water systems on <br />either side of the channel. <br />Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering Services 30I Page b' u i 2 d i u df r� e z l c a <br />www.AescoTech.com 7 z a m % 4 e Cf z a u u d 'U A <br />