My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 21 - On -Call Material Testing and Special Inspection Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
Item 21 - On -Call Material Testing and Special Inspection Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 3:29:33 PM
Creation date
8/21/2023 3:49:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
21
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sched u le of Fees <br />Effective January 2021 <br />AESCO <br />G212 <br />Environmental Soil Boring with Direct Push Portal to Portal, per hour ...................$ <br />380 <br />G213 <br />Environmental Groundwater Sampling with Grundfos, Portal to Portal, per hr..... <br />$ 275 <br />G214 <br />Environmental Analysis of soil for waste classification,persample ........................$ <br />by quote <br />G215 <br />Environmental Analysis of liquid forwaste classification, persample ....................$ <br />by quote <br />G216 <br />Ground Resistance Tester (Four Point Method), plus travel ....................................$ <br />1700 <br />G217 <br />Potholing, two -man crew, per hour...........................................................................$ <br />575 <br />Mix Design Review <br />Co51 <br />D250 <br />Review of Concrete Mix Design..................................................................................$ <br />160 <br />D251 <br />Review of Grout Mix Design........................................................................................$ <br />160 <br />D252 <br />Review of Mortar Mix Design.....................................................................................$ <br />160 <br />D253 <br />Review of Asphalt Mix Design.....................................................................................$ <br />200 <br />Sample Pick-Up/Hold <br />Cost <br />All hold samples are charged atthe same rate as the testing rate <br />U303 <br />Technicianfor Specimen pick up, minimum 2 hours, per hour ................................$ <br />105 <br />U304 <br />Vehicle, pertrip (Up to 100miles)..............................................................................$ <br />70 <br />Field Equipment Charges <br />Cosi <br />E350Brass <br />Mold, each ..........................................................................................................$ <br />20 <br />E351 <br />Concrete Air Meter,perday........................................................................................$ <br />50 <br />E352 <br />Concrete Unit Weight (Scale, Bucket, Rod and Mallet), perday ..............................$ <br />30 <br />E353 <br />Field Vehicle Usage, pertrip (Up to 100 miles)..........................................................$ <br />70 <br />E354 <br />Concrete/Asphalt Coring Equipment rental per hr, min 4 hrs and 8 hrs after ........ <br />$ 190 <br />E355 <br />Fire proofingAd hesion/Cohesion, pertest.................................................................$ <br />20 <br />E356 <br />Hand Auger Equipment, perday.................................................................................$ <br />125 <br />E357 <br />Level D Personal Protective Equipment (PPE), perperson perday ..........................$ <br />40 <br />E358 <br />Liquid Penetrating Consumables, perday..................................................................$ <br />30 <br />E359 <br />Magnetic Particle Equipment and Consumables, perday........................................$ <br />40 <br />E360 <br />Ultrasonic Equipment and Consumables, per day .....................................................$ <br />65 <br />E361 <br />Nuclear Density Gauge Usage, perhour....................................................................$ <br />18 <br />E362 <br />Compaction Test, per location/pe r test .....................................................................$ <br />20 <br />E363 <br />Portable Concrete Laboratory -not including Technicians,perday ..........................$ <br />by quote <br />E364 <br />Pachometer(RebarLocator), perday........................................................................$ <br />55 <br />E365 <br />Environmental PID Usage, perday.............................................................................$ <br />190 <br />E366 <br />Pull Test Equipment,perday......................................................................................$ <br />70 <br />E367 <br />Sand Cone Test Kit (Scale, Burner, Sand Cone Apparatus), perday .........................$ <br />170 <br />E368 <br />Schmidt Hammer, perday...........................................................................................$ <br />50 <br />E369 <br />Torque Wrench, Small, per day..................................................................................$ <br />20 <br />E370 <br />Torque Wrench, Large, perday..................................................................................$ <br />35 <br />E371 <br />Torque Multiplier (Skidmore), perday.......................................................................$ <br />90 <br />E372 <br />Miscellaneous Equipment Charge..............................................................................$ <br />by quote <br />E373 <br />Vapor Emission Kit, each.............................................................................................$ <br />55 <br />Page 3 of 8 <br />Construction Material Testing/ Inspection <br />Environmental and Geotechnical Engineering <br />www.AescoTech.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.