Laserfiche WebLink
CITY OF SANTA ANA <br />TABLE OF CONTENTS <br />PROJECT NO_: 21-6907 <br />LOCAL STREET PREVENTATIVE MAINTENANCE FX 20-21 <br />SECTION / ITEM PAGE <br />1,00 <br />Special Provisions - Construction <br />1,01 <br />Rock Products....................................................................................................................24 <br />1.02 <br />Relative Compaction Tests................................................................................................24 <br />1.03 <br />Clearing and Grubbing,..................................................................................................24 <br />1.04 <br />Unclassified Excavation..................................................................................................24 <br />1.05 <br />Subgrade Preparation................................................................................ <br />.......................24 <br />1.06 <br />Cold Milling... ...................................................................................., <br />.....................I....1.25 <br />1.07 <br />Slurry Sea] Surfacing.........................................................................................................25 <br />1,08 <br />Asphalt Concrete...............................................................................................................27 <br />1.09 <br />Pavement Fabric..............................................................................................................29 <br />1.10 <br />Asphalt Rubber Hot Mix (ARHM)................................................ <br />................................29 <br />1.11 <br />Crack Repair and Patching.............................................................................................30 <br />1.12 <br />Portland Cement Concrete (PCC)...................................................................................... <br />30 <br />1.13 <br />Concrete Curbs, Gutters, Walks, Ramps, Driveway Approaches, Alley <br />Aprons, and Cross Gutters..............................................................................................31 <br />1.14 <br />Portland Cement Concrete (PCC) Grinding.....................................................................32 <br />1,15 <br />Portland Cement Concrete (PCC) Pavement Construction...............................................32 <br />1.16 <br />Landscaping and Irrigation Repair.....................................................................................33 <br />1.17 <br />Root Shaving..................................................................................................................33 <br />1.18 <br />Adjustment of Surface Utilities to Grade...........................................................................34 <br />1.19 <br />Pulverize & Cement -Treat Existing Asphalt Concrete, Base, <br />and Subgrade ....... Not Used <br />1,20 <br />Remove Excess Pulverized Material.................................................................... <br />Not Used <br />1.21 <br />Cold In -Place Recycling (CIR) / Cold Central Plant Recycling (CCPR) ............. Not Used <br />1.22 <br />Cold In -Place Recycling Expanded Asphalt Mix (CIR> AM) <br />.............................. Not Used <br />1.23 <br />Asphalt -Rubber Cape Seal................................................................................. <br />Not Used <br />2.00 <br />Special Provisions - Traffic Signing & Striping <br />2.01 <br />Scope of Work...................................................................................................................36 <br />2.02 <br />Striping (Traffic Stripes and Pavement Markings).......................... <br />...............................36 <br />2.03 <br />Signs (Roadside Signs) and Markers.......................................... <br />.....................................39 <br />.3.00 <br />Special Provisions - Traffic Control <br />3.01 <br />General.............................................................................................................................43 <br />3.02 <br />Project Phasing and Lane Requirements........................................................................44 <br />3.03 <br />Advanced Warning Signs..................................................................................................45 <br />3.04 <br />Traffic Control Plan Preparation and Submittal................................................................46 <br />3.05 <br />Payment.................................................................................... <br />.........................................46 <br />4.00 Special Provisions - Traffic Signal Systems ........................................................ Not Used <br />5.00 Special Provisions - ftrigation, Landscaping, & Maintenance Period .............. Not Used <br />6.00 Special Provisions -Sanitary Sewer Improvements ........................................... Not Used <br />ii <br />