Laserfiche WebLink
February 18, 2021 <br />PROJECT MANAGER & KEY CONTACT <br />Michael Greer, PE, TE <br />City of Santa Ana <br />y <br />Attn.: Kenny Nguyen <br />Dokken Engineering <br />Public Works Agency; M-36 <br />1450 Frazee Road, Suite 100 <br />20 Civic Center Plaza; 311 FI. Reception, Ross Annex <br />San Diego, CA 92108 <br />Santa Ana, CA 92701 <br />Tele: (858) 514-8377 <br />Subject: McFadden Avenue Protected Bike Lane and <br />Fax: (858) 514-8608 <br />Bicycle Boulevard from Harbor Boulevard to <br />Mobile: (858) 276-9726 <br />Grand Avenue, RFP No. 20-164 <br />E-Mail: mgreer@dokkenengineering.com <br />Review Panel Member, <br />As a firm that specializes in Public Agency Projects, we understand the objective of our clients while <br />addressing the needs of the stakeholders. Dokken Engineering is uniquely qualified to deliver this <br />project because: <br />• We have selected a Project Manager in Michael Greer, PE, TE who has demonstrated an ability <br />to succeed on traffic improvement related projects with accelerated delivery schedules. Mr. Greer <br />brings over 12 years of experience in the management, design, and delivery of transportation <br />projects for public agencies. Mike has recently completed the design of similar projects for the <br />County of San Diego, City of Vista, and City of Palm Desert; Mike and his team are immediately <br />available to begin the design and management of this project. <br />• Mike has developed a team to deliver Final Construction Documents to the City of Santa Ana <br />within Nine (9) months of NTP. Mike's team has a proven track record of delivering accelerate <br />project schedules, funded via ATP Grants. A recent example is the San Pablo Ave, Phase II <br />Streetscape Project. After successful completion of Phase I, Dokken delivered Phase II of this <br />transformative project in seven months to include 116 plan sheets and a construction cost of $7.7 <br />million for the City of Palm Desert. <br />• Our team has designed several pavement, sidewalk, and curb ramp rehabilitation projects that <br />include restriping to add bike lanes. Our in-house staff of over 100 engineering professionals in <br />our San Diego and Folsom offices will be supplemented by a proven design firm in FPL & <br />Associates, who has provided traffic signal design and modification plans for the City of Santa <br />Ana for over 25 years. GUIDA Surveying, Inc. will provide the aerial image and topographic base <br />map and we have NOVA on board to provide infiltration recommendations. Our team understands <br />the roadblocks that can occur when delivering this type of project and we developed an approach <br />to project coordination that resolves these issues efficiently. <br />• Dokken has a reputation for our ability to provide effective, constructible designs that get built. <br />This reputation is supported through our continuous effort to repeatedly demonstrate our ability <br />to provide quality construction documents, at the lowest cost, and ahead of schedule. <br />• Dokken Engineering certifies (under penalty of perjury) that we comply with nondiscrimination <br />requirements of the state and federal government. The following individual has the authority to <br />negotiate and contractually bind Dokken Engineering for this project: <br />John A Klemunes, PE — President, Principal in Charge <br />Dokken En ineering — 1450 Frazee Road, Suite 100, San Diego, CA 92108 <br />(g858) 514-8377I jklemunes@dokkenengineering.com <br />Dokken Engineering's mission is to provide superior service to our clients. We strive to be responsive <br />and flexible, which results in projects being delivered on time and within budget. Thank you for the <br />opportunity to submit on this exciting and transformative project that we know will be appreciated by <br />the community. Our proposal and fees shall remain firm for a period of 90 days. <br />Sincerely, <br />DO �nEN` ENGINEERING <br />Mi h Grer, PE TE <br />Pr ject Manager <br />A� <br />ohn A. Klemune , PE <br />resident, Principal in Charge <br />145o Frazee Road, Suite loo, San Diego, CA 921o8 9 Tele: 858.514.8377 • Fax: 858.514.8377 9 www.dokkenengineering.com <br />