Laserfiche WebLink
TPM), easements documents, plats, plumbing, fire, dry utility plans and other documents as provided <br />in the RFP Appendix (Attachment 1, Page 3 of ). As it pertains to the City's sewer and water facilities, <br />addressing specific concerns of the Water Resources Division will be imperative. The review of sanitary <br />sewer systems would generally include mainline and lateral design, materials, fittings, manholes, <br />clean -outs, gas venting, backflow preventers, and other related appurtenances. The review of water <br />improvements may involve domestic, reclaimed (limited per City infrastructure) and fire water design, <br />materials, fittings, hydrants, air blow -offs / air and vacuum release valves, gate / butterfly valves, <br />backflow preventers / detector checks, domestic and irrigation meters, and other related <br />appurtenances. Typical item requirements to address general and specific Water Resources Division's <br />concerns may include, but not limited to the following: <br />Conformance with the latest revision of the City's Design Guidelines and Standard Drawings <br />for Water and Sewer Facilities dated November 2020, including typical requirements such as <br />for the inclusion of the latest standard water and sewer notes, utilizing standard construction <br />notes/format, identification of applicant and engineer of record, legal description listing, drafting <br />standards, etc. Specific department provisions may include items ranging from a signature <br />block placement for the Water Resources Manager on the plans to specific provisions for lateral <br />service connections to mainline depending on pipe size and material (hot taps, tee -cuts, etc.) <br />2. Identification of all existing public/private water and sewer mainlines and service laterals, lateral <br />centerline stationing, pipe size and material, meter size, location of sewer manholes and <br />cleanouts, fire hydrants, backflow devices and easements on plan; identification of all proposed <br />service lateral locations including centerline stationing, pipe size, material and slopes. <br />3. Verification of proposed meter and lateral sizing (demand calculations), development <br />contribution to sewer mainline, adequate line pressures for domestic water and fire service <br />(pressure information on meters, hydrants, valves, etc., via the Automated Meter Infrastructure <br />deployment or AMI when implemented by City), minimum horizontal and vertical pipe <br />separations, minimum pipe cover, allowable pipe material specification, backflow protection for <br />fire lines, potential dry/wet utility conflicts, sewer backflow and water pressure regulator valves, <br />abandonments of existing unused services at the mainline, OCFA fire sprinkler requirements, <br />manhole and cleanout placements, meter vault placements and clearances, facility placements <br />within public/private property and easements, approved backflow devices, trenching and <br />repairs, and other appurtenances. <br />4. Specific water provisions such as allowance for 1" to 2" water service hot -taps to concrete <br />(ACP) or steel mainlines with mandated joint -to -joint replacement of ACP pipe section with PVC <br />pipe and "tee" fitting for larger water services; acceptable pipe material (PVC C900 DR-14); use <br />of mechanical and flange joints as opposed to push -on connections; separate water (and sewer <br />services) for commercial developments such as for services to individual units within a mini - <br />mall (but case -by -case determination for high rise developments) with allowance for manifolds <br />for 3" or larger service (per COA); no splicing of copper services; no deviation of sewer to water <br />pipe separation (minimum 10' horizontal and 1' vertical between mainlines, and minimum 5' <br />horizontal and V vertical between laterals) unless the deviation is cleared by Division of Drinking <br />Water (DDW); abandonment of unused services to the corporation stop (per Std. Plan); and <br />use of combined water and fire service meters limited to a 1" combination meter only. <br />5. Specific sewer provision such as the use of transition couplers (Mission Clay) and stainless - <br />steel bands for PVC lateral wye-connection to VCP sewer lines; acceptable pipe materials for <br />sewer pipes (VCP or PVC SDR 26); minimum sewer (and water) separation from other utilities <br />of 5' with separation of 2' to 3' acceptable for short segments only; sewer by-pass plans required <br />for new 10" or 12" pipe connections; manhole use for 8" or larger laterals; construction potholing <br />and CCTV required to locate utilities; and abandonment of unused services to mainline wye. <br />16755 VON KARMAN AVENUE, SUITE 150, IRVINE, CA 92606 1 949,474.2330 1 ADAM5-STREETER,COM Page 10 <br />