My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Resolution for Fiscal Year 2021-2022 Senate Bill 1 Projects
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
06/01/2021 Regular
>
Item 20 - Resolution for Fiscal Year 2021-2022 Senate Bill 1 Projects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 4:22:23 PM
Creation date
8/21/2023 4:22:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
6/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along <br />Bristol Street between Santa Clara Avenue and Memory Lane. <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating <br />due to weather, age, and heavy usage. Some of the adjacent curbs, <br />gutters, driveway approaches, curb ramps, and sidewalks are also in <br />various states of disrepair and require replacement. <br />PROJECT TITLE: <br />Bristol Street Rehabilitation: Santa <br />Clara to Memory Lane <br />PROJECT CATEGORY: <br />Arterial Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 07-May-2021 <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 870,000 ------ <br />Engineering 70,000 ------ <br />TOTAL 940,000 ------ <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />RMRA SB1 940,000 ------ <br />TOTAL 940,000 ------
The URL can be used to link to this page
Your browser does not support the video tag.