Laserfiche WebLink
CITY OF SANTA ANA FY 21/22CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps along <br />Bristol Street between Santa Clara Avenue and Memory Lane. <br />PROJECT NEED: <br />This segment of roadway has been identified as a high priority by the <br />City's Pavement Management System. The pavement is deteriorating <br />due to weather, age, and heavy usage. Some of the adjacent curbs, <br />gutters, driveway approaches, curb ramps, and sidewalks are also in <br />various states of disrepair and require replacement. <br />PROJECT TITLE: <br />Bristol Street Rehabilitation: Santa <br />Clara to Memory Lane <br />PROJECT CATEGORY: <br />Arterial Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Sean Thomas, Senior Civil Engineer 07-May-2021 <br />PROJECT COSTS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />Construction 870,000 ------ <br />Engineering 70,000 ------ <br />TOTAL 940,000 ------ <br />SOURCE OF FUNDS FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 <br />RMRA SB1 940,000 ------ <br />TOTAL 940,000 ------