Laserfiche WebLink
REVENUE ADOPTED <br />FY 20-21 <br />PROPOSED <br />FY 21-22 DEPT CHANGES <br />ACCOUNT DEPARTMENT/MISCELLANEOUS FEE OR SERVICE UNIT FEES FEES <br />SECTION IX PLANNING & BUILDING AGENCY <br />51601 123)Permit Issuance Fee - EMP and Misc. Building flat 59.30 59.30 <br />51602 <br />51603 <br />51604 <br />51601 124)Permit Issuance Fee - Residential and Non Residential flat 158.15 158.15 <br />51600 125)Permit Issuance Fee - General Plan Update surcharge f)flat 23.79 23.79 <br />51601 126)Permit Renewal/Extension Fee flat 86.33 86.33 <br />51602 (per permit renewed or extended) <br />51603 <br />51604 <br />51601 127a Residential Photovoltaic System (1kW to 15kW) flat 450.00 450.00 <br />Plus each additional kW over 15kW each 15.00 15.00 <br />127b Residential Thermal Systems (1kwth to 10 kWth) flat 450.00 450.00 <br />Plus each additional kWth over 10kWth each 15.00 15.00 <br />127c Commercial Rooftop Solar (1kW to 50kW)flat 1,000.00 1000.00 <br />Plus each additional kW over 50kW up to 250 kW each 7.00 7.00 <br />Plus each additional kW over 250kW each 5.00 5.00 <br />127d Commercial Thermal Systems (1kWth up to 30kWth) flat 1,000.00 1000.00 <br />Plus each additional kWth between 30kWth up to 260kWth each 7.00 7.00 <br />Plus each additional kWth over 260kW each 5.00 5.00 <br />53600 128)Solar Panel - Structural Plan Check hourly 239.34 239.34 <br />51601 129)Solar Panel - Inspection Residential flat 352.57 352.57 <br />51601 130)Solar Panel - Inspection Commercial flat 1062.48 1,062.48 <br />51601 131)Field Plan Check - subject to field Structural Plan Check hourly 172.65 172.65 <br />53600 132)Cell Tower - Structural Plan Check hourly 239.34 239.34 <br />53600 133)Deferred Submittal - Structural Plan Check hourly 239.34 239.34 <br />51