Laserfiche WebLink
Santa Ana 2020 Urban Water Management Plan <br />arcadis.com <br />9-18 <br />Table 9-5: CII BMP Implementation Programs Offered <br />Component Program Offered Impact <br />CII Performance Measures Water Savings Incentive <br />Program (WSIP) <br />On-Site Retrofit <br />Program (ORP) <br />HETs <br />HE Urinals <br />Plumbing Flow Control <br />Valves <br />Connectionless Food <br />Steamers <br />Air-cooled Ice Machines <br />Cooling Tower <br />Conductivity controllers <br />Cooling Tower pH <br />Controllers <br />Dry Vacuum Pumps <br />Laminar Flow <br />Restrictors <br />WSIP incentivizes customized <br />CII water efficiency projects that <br />utilize BMPs. <br /> ORP incentivizes the conversion <br />of potable to recycled water, <br />and is applicable to CII <br />dedicated irrigation meters or <br />CII mixed-use meters that may <br />be split to utilize recycled water <br />for irrigation. <br />Additional CII rebates based on <br />BMPS increase the economic <br />feasibility of increasing water <br />efficiencies.