My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Jerome Park Ballfield Lighting Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
Item 11 - Jerome Park Ballfield Lighting Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:24:00 PM
Creation date
8/21/2023 4:35:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
5/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAko <br />f}B 1p <br />nm <br />mx 0 <br />OPOSED SPCCER FIEi% <br />mn <br />z0 <br />I <br />ti �a <br />I <br />iGRASS <br />SO�-C R FIELD <br />2 <br />0 <br />IAC I <br />PA�EMjN1 <br />EX. BASEBALL <br />FIELD tt2 <br />P <br />GRID SUMMARY <br />NAME: SOCCER FIELD 2 <br />SIZE: 105 X 165 <br />SPACING: 20.Q' X 20.0' <br />HEIGHT: 3.0 ABOVE GRADE <br />C <br />a Mtih N <br />C2 <br />ppOSED SO�QER FIELD <br />a` <br />EX. MOUND <br />O <br />SOCCER .IELD 1 <br />EX BASEBALL <br />A3 - PfloTEc°E Isn G ARDscAPE� A2# B2 <br />/ D LArvDSC PE Iry PLACE^ <br />w. <br />ILLUMINATION SUMMARY <br />MAINTAINED HORIZONTAL FOOTCANDLES <br />ENTIRE GRID <br />GUARANTEED AVERAGE: 30 <br />SCAN AVERAGE: 33.59 <br />MAXIMUM: 42 <br />MIN MUM: 26 <br />AVG/MIN: 1.28 <br />GUARANTEED MAX/MIN: 2.5 <br />MAX / MIN: 1.61 <br />UG (ADJACENT PTS): 1.33 <br />CU: 0.22 <br />NO. OF POINTS: 40 <br />LUMINAIRE INFORMATION <br />APPLIED CIRCUITS: B <br />NO. OF LUMINAIRES: 26 <br />TOTAL LOAD: 23.49 kW <br />REVISIONS <br />GRID SUMMARY <br />NAME: <br />SOCQER FIELD 1 <br />MMARY <br />MAINTAIINEDOHORIZONTAL <br />FOOTCANDLES <br />SIZE: <br />SPACING: <br />105 X 165 <br />20.9' X 20.0' <br />ENTIRE GRID <br />HEIGHT: <br />3.0 ABOVE GRADE <br />GUARANTEED AVERAGE: <br />30 <br />SCAN AVERAGE: <br />32.82 <br />MAXIMUM: <br />42 <br />MIN MUM: <br />27 <br />AVG/MIN: <br />1.24 <br />GUARANTEED MAX/MIN: <br />2.5 <br />MAX / MIN: <br />1.57 <br />UG (ADJACENT PTS): <br />1.25 <br />CU: <br />0.23 <br />FIELD MEASUREMENTS: INDIVIDUAL FIELD <br />MEASUREMENTS MAY VARY FROM <br />COMPUTER —CALCULATED PREDICTIONS AND <br />SHOULD BE TAKEN IN ACCORDANCE <br />WITH IESNA RP-6-15. <br />ELECTRICAIA SYSTEM REQUIREMENTS: <br />REFER TQ MUSCO CONTROL SYSTEM <br />SUMMARY FOR ELECTRICAL SIZING. <br />INSTALLATION REQUIREMENTS: RESULTS <br />ASSUME +3% NOMINAL VOLTAGE AT <br />LINE SIDE OF THE DRIVER AND <br />STRUCTURES LOCATED WITHIN 3 FEET OF <br />DESIGN LOCATIONS. <br />m®smom�m <br />mmmm=® <br />II�®IIIII� <br />''lll®IIII�® <br />NO. OF POINTS. 40 Undelgmund Service Alen <br />LUMINAIRE INFORMATION TWO WORKINc�Onvs <br />APPLIED CIRCUITS: A BEFORE YOU DIG <br />NO. OF LUMINAIRES: 26 p, <br />TOTAL LOAD: 22.93 kW NOTICE TO CCNINACTCR <br />�i, to CL_1xc0[xtAY111, <br />REFERENCES <br />�or[a <br />TouN �b'£b <br />G �� <br />RCE6/l0/120W <br />PREPARED UNDEfl <br />THE SPERVISI ON <br />OF <br />KEWHY NGUYEN <br />'T�'—' <br />DATE <br />PHOTOMEW BRE PLAN L BE <br />JEROME PARK BALLFIELD LIGHTING <br />(WEST FIELD) <br />SENIOR CIVIL ENGINEER RCE NO.: 6603 <br />ELEV.: NNN.NN' NMYY <br />DESIONEO: NL ORAWN: AN CHECKED: W <br />03/2021 <br />CONS RUENEDCilONFOR <br />JASON GABRIEL <br />PRNCIPAL CIVIL ENGINEER RCE NO.: 62969 <br />o3i2o2, <br />PUBLIC WORKS AGENCY <br />CITY OF SANTA ANA SHEET 8 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.