My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Jerome Park Ballfield Lighting Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
Item 11 - Jerome Park Ballfield Lighting Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:24:00 PM
Creation date
8/21/2023 4:35:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
5/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- - - - - - - - - - - - - - - - - - - <br />PA' 1P X X X X X/7`5 X x <br />w(� <br />�\ Le- <br />4 <br />RICAL (CONCESSION 6 <br />BU[L ING <br />CONSTRUCTION NOTES: <br />OREMOVE EXISTING IRRIGATION CONTROLLER AND INSTALL NEW NEMA 3R CABINET TO HWSE <br />100-MP. 480 / 272-VOLT. 3 PHASE. 4 WIRE. 24 SPACE ELECTRICAL PANEL "H2'. <br />ENCLOSURE SHOULD PROVIDE SPACE FOR MUSCO CONTROLLER AND ASSOCIATED ECUIPMENT. <br />NEW ELECTRICAL PANEL FEEDER TO RUN IN AN EXISTING CONDUIT FROM MAIN ELECTRICAL <br />ROOM THAT TERMINATES AT EXISTING PULL BOX. FROM EXISTING PULL BOX. NEW WIRE <br />AND CONDUIT WILL TERMINATE AT NEW <br />ELECTRICAL PANEL. SEE EXISTING SINGLE LINE <br />DIAGRAM ON SHEET B002 FOR MORE INFORMATION.REMOVE AND PROTECT EXISTING <br />IRRIGATION EQUIPMENT FOR REINSTALLATION. <br />OEACH LIGHT POLE TO HAVE A PULL BOX AT BASE OF POLE AS SHOWN ON PULL BOX DETAIL. <br />SHEET BDOt. POLE C2 FWTING MIST BE PLACED AT SAME LEVEL AS POLE C1. PULL BOx <br />AT A2. 82. Q. AND BJ SHALL HAVE <br />LOCKING DEVISE SIMILAR TO EXISTING PULL BOX. <br />OFURNISH AND INSTALL I "' C. WITH J W12 a 1 112 GND. FROM PULL BOX AT BASE <br />OF POLE UP TD LIGHT. TYPICAL AT EVERY LIGHT POLE. <br />O SEENISX AND INSTALL 2" C. WITH J 1AND I IO GND. FROM MUSCO CONTROL CONTRACTIS. <br />MUSCO PANEL SUMMARY ON SHEET BD01 FOR CONTACTOR AND CIRCUIT INFORMATION. <br />O CUi ixROUGx WALL Arv0 CONNECT NEW 2' C. WITH A W1 t 1 WB INC. FROM EXISTING SPARE <br />I OOa/}P CIRWIT BRE AXER IN EXISTING 400/2 ]iv. 3 PHASE. aN SWITCHBOARD <br />"MSB" TO <br />EXISTING <br />PULL BOX MOUNTED BELOW EXISTING SUB -PANEL %L IN THE CONCESSION ROOM. <br />EXTEND NEW 4 W1 - 1 WB GND. THROUGH EXISTING 2°C TO EXISTING E.TENI OR IN GRADE <br />PULL BOX. <br />© FURNISH AND INSTALL 4 WI AND 1 WB DID. IN EXISTING 2" CONDUIT. <br />FURNISH AND INSTALL 2" CONDUIT. BACKFILL TO MICH EXISTING (ADD ALTERNATE BID, <br />OT INSTALL CI iY OF BAHTA ANA PROVIDED TYPE 11 DISTR IBUi IOH, 11Fi POLE. <br />CONNECT TO Ex I STI NG PULLBOx. REFER TO SHEET BDOJ FOR POLE DETAIL. <br />OINSTALL CI iY OF $1HT1 axa PROVIDED TYPE Iv DISTR IBUT ION. tIFi POLE. <br />CONNECT TO Ex I STI NG PULLBOx. REFER TO SHEET BD03 FOR POLE DEia1L. <br />OFURNISH AND INSTALL 2" C WITH 9 WB AND I W10 GND. FROM MUSCO CONTROL CONTACTORS. <br />SEE MUSCO PANEL SUMMARY ON SHEET BD01 FOR CONTACTOR AND CIRCUIT INFORMATION. <br />10 FURNISH AND INSTALL 2" C WITH 6 WB AND I W10 GND. FROM MUSCO CONTROL CONTRACTORS. <br />SEE MUSCO PANEL SUMMARY ON SHEET BD01 FOR CONTACTOR AND CIRCUIT INFORMATION. <br />O EXISTING SWITCHBOARD "MSB". SEE EXISTING ELECTRICAL SINGLE LINE DIAGRAM <br />ON SHEET BD02 FOR MORE INFORMATION. <br />tot FURNISH AND INSTALL 2 W10 THHN/THWN-2-CU AND 1 W10 CU-GND. IN EXISTING t'.R" CONDUI <br />tl BORE UNDER CONCRETE AND DO SURFACE. PROTECT CONCRETE PAD AND DO SURFACE. <br />OREMOVE EXCESS DIRT AND GRADE TO FLUSH WITH PFIROPOSED SOCCER FIELD SURFACE, EXCESS <br />DIRT TO BE DISTRIBUTED IN LOW SPOTS INTHE ELD. ADJUST SPRINALER PIPES AND HEAD <br />TO NEW SURFACE. PLACE SEED OVER GRADED AREA. IADD ALTERNATE BID, <br />GENERAL NOTES: <br />1, REFER TO SINGLE LINE DIAGRAM FOR CONDUIT AND <br />WIRE SIZES FOR SWITCHBOARDS. PANELBOARDS AND TRANSFORMERS. <br />2, ELECTRICAL DISTRIBUTION EQUIPMENT SHOWN ARE BASED ON INDUSTRY <br />STANDARD SIZES. CON TRACTOR SHALL VERIFY THAT THE FINAL EOU"WEHT <br />SELECTION FITS IN THE ALLOCATED SPACE. <br />J. NEW UNDERGROUND CONDUIT SHALL BE INSTALLED A MINI 1. OF 24" III Ow <br />FINISHED GRADE. UNLESS REWIRED OTHERWISE. <br />4. EXTERIOR MOUNTED ELECTRICAL DEVICES SHALL BE IN NEMA 3R ENCLOSURES. <br />5. CONTRACTOR SHALL INCLUDE IN HIS BID THE COST Di CONDUIT. TRENCHING. <br />AND BACKFILLING FROM THE PANEL BOARD AND STUB-0UT LOCATION SHOWN. <br />6, ELECTRICAL CONTRACTOR TO NOTIFY ENGINEER OF ANY CONFLICTS OR <br />DISCREPANCIES MIT. WHAT IS SHOMN ON THESE PLANS AND ACTUAL <br />FIELD CONDITIONS PRIOR i0 BEGINNING WORK. <br />T. REFER i0 TRENCHING DETAIL ON SHEET ...I FOR TYPICAL TRENCHING <br />INFORMATION. <br />B. CONTRACTOR TO SCHEDULE FIELD MEETING WITH CITY STAFF PRIOR TO <br />INSTALLATION 6 CONDUITS TO MINIMIZE DAMAGE TO EXISTING LANDSCAPE. <br />HARDSCAPE.AND BUILDING. <br />9. EXIS ING (2) 2- CONDUIT RUNS FROM PULL BOX TO PEDESTAL: <br />PBWI - LOW VOLTAGE IRRI MIRE: PBAG - 3 W5 A I W6 GROUND <br />m <br />mwmmIIIII <br />m <br />m®mm=® <br />®==IIIIIIWIIIIII <br />®w=IIIIIIRIIIIIIII <br />o®mm® <br />women <br />19'i141'®® <br />m <br />II� <br />®IIIII� <br />III <br />IIIII <br />BiN IS TRU TURE UTILIZES A <br />ACK-i -Ba K <br />MOUNTING C NFIGURATION <br />Underground Service Alert <br />j TWO WORN ING DF.—ft I DAYS <br />M <br />BEFORE YOU DIG <br />CaII�eMan ya'a. <br />a N=M To CONMACfOR <br />REVISIONS <br />REFERENCES <br />P,uTM, <br />° 1ON1 <br />o <br />UU-- <br />TFE ibPERVI510x <br />xE1NY NGUTEN <br />ELECTRICAL SITE PLAN <br />JEROME PARK BALLFIELD LIGHTING <br />(WEST FIELD) � <br />SENIOR CIVIL ENGINEER <br />NUMBER <br />DATE <br />INITIAL <br />DESCRIPTION <br />APPROVED <br />INSTALLEOBENCHMRK <br />NO.: %%-%%x-%% ELEV.: NNN.NN' NAVOYY <br />CONSTRUCTION COMPLETED: <br />pE51 GNEO: M PRAWN: KM CXECXEp: M. <br />OJ/202t <br />(INSTRUCTION! <br />JAS0N GABRIEL <br />s <br />PRINCIPAL CIVIL ENGWER RICE NO.: 62960 <br />03/2021 <br />0�1 <br />r' <br />PUBLIC WORKS AGENCY <br />PUBLIC <br />CITY OF SAHTA ANA SHEET 3 OF 9 I <br />Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.