My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:27:38 PM
Creation date
8/21/2023 4:37:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
5/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />SANTIAGO PARK MAIN STREET ENTRANCE DESIGN <br />RFP NO.20-154 <br />INTRODUCTION/BACKGROUND <br />Santiago Park is a 35-acre linear park located in the northern edge of the City of Santa Ana along <br />Santiago Creek. It is the city's oldest and largest wilderness park. The park contains both passive <br />and active recreation opportunities which run along both sides of Santiago Creek and includes <br />acres of restored riparian habitat, recreational trails, a nature reserve, the "Wildlife and Watershed <br />Interpretive Center," the "Wildlife and Habitat Viewing Facility," the Santiago Park Lawn <br />Bowling Clubhouse and greens, archery, tennis courts, a baseball field, log cabin, and playground <br />equipment. <br />At the west end of Santiago Park is a dated large barren area, approximately 2.298 acres adjacent <br />to Main street and Santiago Creek that is in need of repair and revitalization to serve both <br />community, visiting bicyclist, joggers and Discovery Museum patrons. Public access to this area <br />is from Main Street on the west and Memory Lane no the north and Valencia Street on the east. <br />The "Santiago Park Entrance Sign Improvements" (the project) includes the relocation of the <br />existing park maintenance road to the south. This will provide space to construct separate bike <br />and hiking/jogging trails adjacent to Santiago Creek. Project will include two viewing decks <br />overlooking the creek with interpretive signage that will be accessible from the trails. Picnic <br />tables will be constructed throughout the site along with small parking lot for park patrons. An <br />existing large parking lot is available off Memory Lane. Other improvements will include <br />security lighting, drinking fountain, irrigation, native riparian and drought tolerant planting. An <br />existing park restroom, play equipment and log cabin is located and available to park patrons on <br />the east end of the project site. A major Shopping Center and restaurants are located north of the <br />project site. <br />The park area comprising the project's Scope of Work, is between the existing play equipment / <br />children's play area (to the east), Main Street Roadway (to the west), and the Santiago Creek to <br />the north and the Business Center on the south. It is shown in a diagrammatic site plan included <br />in this Request for Proposals as part of this Attachment 1. <br />The project, as represented in the concept plan and as outlined below under Consultant <br />Responsibilities shall include the following components: <br />• Park Signage <br />• Viewing Deck with seating areas <br />• Park Roadway with Parking lot improvements at Main Street, including gate, bollards <br />and entrance signage <br />City of Santa Ana RFP 20-154 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.