Laserfiche WebLink
Organizational Chart <br />Vojta Safranek, PE <br />Jason Fukumitsu, PE <br />Ed Mandich, PE <br />Farhad Mohammadi, PE <br />Aylene Chu, PE <br />Alan Oveisi, EIT <br />Landscape 3 <br />Design <br />NUVIS <br />Tom Munoz, RLA <br />Robert Stone, RLA <br />Juan Guadarrama Baz <br />City of Santa Ana - Public Works Agency <br />Richard Norton, PE <br />Gary Guan, PE <br />Patrick Pagaduan, PE <br />Dang Diep, EIT <br />Kris Weber, QSPIQSD <br />Tommy Hsu, QSPIQSD <br />Martin Parker, QSP <br />Cho Design <br />Associates <br />No longer needed in revised <br />proposal since cantilevered <br />viewing decks and <br />pedestrian bridge eliminated. <br />Leighton <br />Consulting <br />John Haertle, PE, GE <br />Djan Chandra, PE, GE <br />RFP No. 20-154 <br />Santiago Park Main Street Entrance Design <br />Jason Kinnie, PLS <br />Bob Epstein, PLS <br />Gary Tackett, LSIT <br />Jon Crisp, PLS <br />Mike Tice, PLS <br />Robert Wheeler, PLS <br />ORSA Engineering <br />Misha Davoodian, PE <br />Hrand Avanessian, PE <br />Al Fonseca <br />Over 200 Supporting Personnel (Engineers, Designers, Drafters, Technicians) <br />30 Fully Equipped Field Crews led by Certified Party Chiefs <br />HUNSAKER&ASSOCIATES IRVINE, INC. <br />