My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:27:38 PM
Creation date
8/21/2023 4:37:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
5/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 20-154 <br />Santiago Park Main Street Entrance Design <br />Storm Drain System <br />The existing surface runoff patterns were planned to drain toward the creek and then pass thru several stone lined <br />overside drains (it appears these may have been constructed as a WPA project in the 1930's). With today's regulatory <br />focus on water quality, treatment of the runoff before entering the creek may be required. To minimize the amount to be <br />treated, the use of permeable pavements for the access road, parking and bikeway would enable rainfall to permeate into <br />the underlying soil. When compared to the existing surface areas, H&A staff believes we can show the amount of runoff <br />has been reduced and the need for water quality treatment can be done effectively with one of more stone lined swales <br />incorporated into the landscape areas using infiltration and/or biological uptake saving the City both construction and <br />operation costs of alternative water quality treatment systems. <br />Site Plan DeficiencieE <br />The site plan in the RFP has several deficiencies that need to be remedied as the design evolves. First the cul-de-sac as <br />shown does not comply with City standards that are based on emergency vehicle maneuvering characteristics. Second <br />the parking located radial to the center will require the minimum width to be available at the "narrow end". The H&A Team <br />has developed an alternative configuration that addresses these deficiencies while remaining generally consistent with <br />the site plan arrangement (see following page). The exceptions are a loss of planting between the roadway and bike trail <br />(we believe the existing pavement may be reused for the bike trail in the H&A layout to save the City money) and some <br />added curves in both the bike trail and decomposed granite walk to accommodate the revised cul-de-sac. <br />HUNSAKER&ASSOCIATES IRVINE, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.