My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:27:38 PM
Creation date
8/21/2023 4:37:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
5/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Research will include records data gathering from all <br />utilities and public agencies operating facilities in the <br />vicinity of the proposed project. All data gathered will be <br />incorporated into the digital base -map and evaluated in <br />conjunction with the field information to identify <br />inconsistencies, missing information and apparent <br />conflicts. <br />Surveying <br />Research on available survey control points and <br />monumentation will start the process. Field survey will <br />establish the project control and place targets for the aerial <br />topo flight. While the flight data is being processed, field <br />crews will gather the cross section information, dip <br />manholes and drain inlets and locate surface utility <br />features. Existing monuments will be accurately located <br />and ties placed to enable post -construction efforts. <br />Concept Plan Development <br />The site plan in the RFP shows there has been some <br />advance planning and H&A will build on that to develop 3 <br />concept plans. These will also reflect the findings of our <br />research, field survey, geotechnical investigations, <br />landscape analysis and initial struc;t oral deyelepmon+ (No <br />longer needed in revised proposal since cantilevered <br />viewing decks and pedestrian bridge eliminated.) <br />H&A looks forward to the three meetings with City staff that <br />we envision to be interactive design workshops with one, <br />or more held at the site to better visualize how the <br />concepts fit with existing conditions. The final activity will <br />be selection of the preferred alternative by City staff to be <br />the basis for the construction documents. <br />TASK 2 — 50% DESIGN DEVELOPMENT <br />The H&A Team will be focused on setting the configuration <br />of the various project components and determining design <br />parameters from calculations done for the grading, <br />drainage, structures, electrical/lighting system and <br />irrigation requirements to support the proposed planting. <br />Cost Estimate <br />The construction estimate will use the project <br />specifications measurement and payment clauses that will <br />be based on the Greenbook standards H&A personnel will <br />determine quantities using CAD software and confirmed by <br />RFP No. 20-154 <br />Santiago Park Main Street Entrance Design <br />BreakdownWork <br />Perform evaluation of <br />F H&A <br />existing electrical equipment <br />Perform evaluation of <br />G <br />existing electrical equipment <br />H&A Team <br />H Evaluate existing plantings <br />H&A Team <br />and irrigation system <br />Develop 3 concept plans <br />using RFP site plan and <br />H&A Team <br />compiled base ma <br />1 st City review - prepare <br />1 <br />agenda, hold meeting, <br />CITY and H&A <br />prepare minutes, revise <br />Team <br />concepts <br />2nd City review - prepare <br />agenda, hold meeting, <br />K <br />CITY and H&A <br />prepare minutes, revise <br />Team <br />concepts <br />3rd City review - prepare <br />L agenda, hold meeting, <br />CITY and H&A <br />prepare minutes, revise <br />Team <br />concepts <br />F7lXFM3=M1=- .. <br />Develop design plans - Civil <br />A ; <br />Engineering <br />H&A Team <br />flovolnp iJocinn plane — <br />StFUGtural (No longer <br />needed in revised <br />l3 proposal since <br />H&A Team <br />cantilevered viewing <br />decks and pedestrian <br />bridge eliminated.) <br />2 <br />Develop design plans - <br />C <br />Landscape <br />H&A Team <br />D Develop design plans - <br />H&A Team <br />Electrical <br />E Develop cost estimate <br />H&A Team <br />F Identify required technical <br />H&A Team <br />specifications <br />HUNSAKER&ASSOCIATES IRVINE, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.