My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
05/18/2021 Regular
>
Item 16 - Design Services for the Santiago Park Main Street Entrance Design Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:27:38 PM
Creation date
8/21/2023 4:37:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
16
Date
5/18/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP No. 20-154 <br />Santiago Park Main Street Entrance Design <br />-P <br />Xrimary Role <br />RFP <br />SERVICES <br />STAFF QUALIFICATIONS MATRIX <br />O - Added Capability <br />Registration <br />and <br />ngfi <br />"N�n Hunsaker 50 1975Civil 1977Civil 198SMS-v�mt.pE <br />X <br />O <br />O <br />O <br />O <br />O <br />O O <br />O <br />O9OOEngineer <br />Wacesta Poly Northeast—Unversily M.I.T.___ <br />_ R ____ 9 _ _____ _______________ <br />Vojta Saferek oadway, Parkin 30 77 2004Civil PE <br />X <br />X <br />X <br />X <br />O <br />O <br />9 <br />O <br />O <br />and Trails UCI <br />Jason Fukumitsu <br />Roadway, Peking <br />20 <br />31 <br />1983Cw1 <br />PE <br />X <br />X <br />X <br />O <br />O <br />O <br />O <br />and Trails <br />Stanford University <br />Ed Mani <br />Roetlway' Parking <br />10 <br />33 <br />1978Geo <br />PE <br />X <br />X <br />X <br />O <br />O <br />O <br />9 <br />O <br />and Trails <br />CSUDH <br />Farhad Mohanmedi <br />Roadway, Parking <br />10 <br />31 <br />1988-Q it <br />PE <br />X <br />X <br />X <br />O <br />O <br />O <br />6 <br />O <br />and Trails <br />Portland State <br />Aylens Chu <br />Roadway, Parking <br />10 <br />10 <br />2010CNil <br />PE <br />X <br />X <br />X <br />O <br />O <br />6 <br />O <br />and Trails <br />CalPay Pomona <br />Alan Ovemi <br />Roadway, Parking <br />10 <br />34 <br />1982Cvil <br />EIT <br />X <br />X <br />X <br />O <br />O <br />O <br />O <br />O <br />and Trails <br />CSUF <br />______________ <br />Gay Guan <br />__________ <br />Storm Drain Plans <br />_____ <br />30 <br />_____ <br />21 <br />_________ <br />1992Civil <br />_________ <br />1999Civil <br />_________ <br />_____ <br />PE <br />X <br />__ <br />O <br />X <br />X <br />O <br />6 <br />O <br />Hydrology & Hydraulic <br />Tmjin University <br />Clemson University <br />Patrick Pagaduan <br />Storm Dmin Plans <br />20 <br />33 <br />1992Cwl <br />1987-BA Economics <br />PE <br />O <br />X <br />X <br />O <br />6 <br />O <br />Hydrology & Hydraulic <br />CSULB <br />UCI <br />Deng Diep <br />Scam Drain Plans <br />10 <br />26 <br />1994-85 Coil <br />EIT <br />O <br />X <br />X <br />0 <br />9 <br />0 <br />Hydrology &Hydraulic <br />Cal Poly Pomona <br />______________ <br />__________ <br />_____--- <br />____ <br />_________ <br />1975 <br />_________ <br />1980Civil <br />_________ <br />_____ <br />__ <br />____ <br />_ <br />Kris Weber <br />Water Qualify Facilities <br />10 <br />42 <br />Environmental Science <br />MS Coursmork <br />QSPIQSD <br />O <br />X <br />X <br />O <br />O <br />O <br />11C8B <br />Cal Poly Pancna <br />1998-Applied Ecology <br />2000-Ecology and <br />Tommy Hsu <br />Water QualBy Facilities <br />10 <br />20 <br />UCI <br />Emionmental Science <br />QSP/QSD <br />O <br />X <br />X <br />O <br />O <br />O <br />University of Maine <br />2004 <br />Martin Parker <br />Water Quaiity Facilities <br />10 <br />17 <br />Enninmenlal Anaysis <br />QSP <br />O <br />X <br />X <br />O <br />O <br />O <br />______________ <br />__________ <br />_____ <br />_______________ <br />UCI <br />_________ <br />_________ <br />_____ <br />__ <br />__ <br />__ <br />____ <br />_ <br />Jason Kinnie <br />Field Surrey <br />30 <br />34 <br />Land Sway Tech <br />pLs <br />X <br />O <br />O <br />O <br />X <br />X <br />X <br />(H&A) <br />Classes <br />Bob Epstein, PLS <br />Field Survey <br />20 <br />42 <br />Land S—y Tech <br />pL5 <br />O <br />O <br />O <br />X <br />X <br />X <br />(H&A) <br />Classes <br />Gary Tsckett <br />Field Survey <br />10 <br />34 <br />Land Swey Tech <br />LSIT <br />O <br />O <br />0 <br />X <br />X <br />X <br />(H&A) <br />Classes <br />Jon Crisp <br />Field Survey <br />10 <br />35 <br />Land Swey Tech <br />PLSO <br />O <br />O <br />X <br />X <br />X <br />(H&A) <br />Classes <br />Mike Tice <br />Field Survey <br />10 <br />35 <br />Engincen'rg Tech <br />Land Sway Tech <br />PLS <br />O <br />O <br />0 <br />X <br />X <br />X <br />(H&A) <br />Cal Poly <br />Class <br />Robert Wheeler <br />Field Survey <br />10 <br />25 <br />2008Cwil <br />Land Survey Tech <br />PLS <br />O <br />O <br />O <br />X <br />X <br />X <br />(MA) <br />Cal Poly <br />Classes <br />______________ <br />Tom Munoz <br />__________ <br />Iandsc.pe Design <br />_____ <br />20 <br />_______________ <br />42 <br />1978-BSLA <br />_________ <br />RLA <br />X <br />O <br />O <br />X <br />6 <br />0 <br />0 <br />(NUVIS) <br />Cel Pay Pomne <br />Robert Stone <br />Lands..pe Design <br />40 <br />1976-BSLA <br />RLA <br />O <br />O <br />X <br />A <br />O <br />O <br />(NUVIS) <br />Cel Pay Pomona <br />Juan Gua�rsma B. <br />lands..pe Design <br />O <br />60 2 201MSLA O O X 6 0-1 <br />______________ <br />(NUVIS) <br />__________ <br />Cal Poly SLO <br />_____ _____ ________ _________ _________ ____ _ <br />Wbert Cho <br />Str. 1— <br />No longer needed in revised proposal since carAilwered viewing dacksand pedestrian bridge aliminatad <br />(Cho Design Associates) <br />Christopher Cho <br />Structuresociates) s <br />No longer needed in revised proposal since cantilevered viewing decks and pedestrian bridge eliminated <br />(Cho Design As <br />__ __ __ ____ __ __ __ __ <br />_TO— <br />______________ <br />John Heatle <br />__________ <br />Geoechnical <br />_____ --- _______________ __ <br />20 y1 198465 Mining 1986Civil PE, GE X O O O O O O B X <br />(Leighlen Consuhing) <br />University of Wscoain University cf Wisconsin <br />Djen Chandra <br />Gectechnical <br />40 <br />32 <br />19%-BS Cvil <br />1988CiOl <br />PE, GE <br />O <br />O <br />O <br />O <br />O <br />O <br />0 <br />X <br />(Leghton Consuhing) <br />Chung Yuen University <br />Taxes A&M <br />______________ <br />__________ <br />_____ <br />_______ <br />977 <br />_ <br />Misha Davaxlian, PE <br />Lighting (ORSA) <br />10 <br />43 <br />ENolricel Engineering <br />PE <br />X <br />O <br />O <br />0 <br />O <br />9 <br />X <br />Sh rze University <br />Hand Avanessian, PE <br />Lighting (ORSA) <br />20 <br />47 <br />PE,MIMS EE, <br />O <br />O <br />O <br />O <br />9 <br />X <br />Pshlevi University <br />S1973-Elearloai <br />EEE <br />A.A. <br />Joumeyman <br />Al Foresca <br />Lighting (ORSA) <br />40 <br />41 <br />Engineeing <br />Cert'rficate in <br />0 <br />0 <br />0 <br />0 <br />0 <br />X <br />Technology <br />COMrd Systems <br />HUNSAKER&ASSOCIATES IRVINE, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.