My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Purchase Order Contract for Shade Canopies at Fitness Courts at City Parks
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
Item 14 - Purchase Order Contract for Shade Canopies at Fitness Courts at City Parks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2023 5:06:15 PM
Creation date
8/21/2023 5:06:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
14
Date
4/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimate <br />CA246359 <br />P.O. Box 1088, TUSTIN, CA 92781 1-800-669-2585 DAVEBANG.COM INFO@DAVEBANG.COM LIC #795052 <br />Page 3 / 4 <br />6. Temporary Fencing <br />*Security guards and/or temporary fencing to prevent injuries, vandalism and/or accidental damage to install area or to the rubberized surface while it sets is NOT included unless noted on quote. If desired, the installers can put up caution tape, but Temporary Fencing is recommended. Although the fencing, if provided, is intended to provide this security, the overall security of the property is ultimately the responsibility of customer. We are not responsible for any vandalism or injuries even with the provision of the fencing. <br />7. ADA Access <br />*Play Equipment MUST be installed over an impact-absorbing surface such as ADA compliant Engineered Wood Fiber or Rubber Surfacing. If not quoted, please call for details. <br />*This area is NOT ADA compliant without the installation of compliant surfacing and an accessible route up to and into the playground area. Please call for details. <br />8. Poured-in-Place Rubber Surfacing <br />*Rubber Surfacing cure time is normally 48-72 hours and can vary depending on weather conditions. <br />*Rubber Surfacing cannot be installed during extreme weather conditions and may also not be installed if rain or frost is forecast during the cure time. <br />*48-Hour Manned Security is NOT included for rubber. <br />9. Shade Shelters (non DSA) <br />*Shade Shelter installation price EXCLUDES – unless otherwise stated in this quote - engineering, permits, permit submittal, site plans, special inspections, soil reports, impact fees, special assessment fees. Customer is responsible for any and all of these items if required by the City. <br />*Shade Shelter manufacture time is 6-8 weeks. Permitting can add 2-4 weeks or more to lead time. PLEASE NOTE: Shade Orders are NOT released into production until permit is issued! <br />*Shade Shelter installation price EXCLUDES concrete pad, footings, masonry columns, electrical wiring and lights unless otherwise noted. <br />10. Shade Shelters (DSA) <br />**6-8 Week lead time is AFTER DSA approval by your architect of choice <br />* Customer to receive shade shelter. If receiving by us is needed, please call for pricing and details! <br />* Job to be completed in one mobilization. Additional moves will be additional pricing if we are required to remobilize due to schedule issues, stop work or a delay in work not caused by us <br />*Pricing does NOT include, architectural drawings, site/plot plans, DSA submittal fees, job site inspector fees, shop welding inspection fees, and/or permits <br />*DSA in-plant Welding Inspector to be hired by the School District. Welding Inspector fee has NOT been quoted. <br />*School District / Architect responsible for submission of plans to DSA for DSA approval <br />*Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. <br />*Fabrication cannot start until inspections have been coordinated, colors have been selected, and approved plans received. <br />11. Prevailing Wages <br />*Prevailing Wages NOT included unless otherwise noted. (ie: Davis Bacon, TERO, ect.) If this is a Prevailing Wage project, please request alternate pricing. <br />*If Prevailing Wages / Davis Bacon Wages were INCLUDED, all other special work fees NOT included - Additional Labor Charges may apply if alternate labor is required. <br />*If DIR Project Registration is required, work may not begin until we receive DIR Project ID number <br />12. Indemnity Provision <br />*Notwithstanding anything to the contrary in any Contract Documents we shall have no duty to defend or indemnify Owner, Customer, or any other party we agree to defend or indemnify in any Contract Documents for that portion of any claim arising out of the comparative fault of any party we agree to defend or indemnify in any Contract Documents. <br />13. Insurance <br />Available Insurance <br />Umbrella / Excess Liability: <br />Each Occurrence - $2,000,000.00 <br />Aggregate - $2,000,000.00 <br />General Liability Limits: <br />Deductible - $2,500.00 <br />Each Occurrence - $1,000,000.00 <br />Damage to Rented Premises - $100,000.00 <br />Exhibit 1
The URL can be used to link to this page
Your browser does not support the video tag.