Laserfiche WebLink
North Harbor Village – Unit Scope  <br />Unit Demolition/Remodel – Building A (No existing Kitchenettes) Building B (Existing Kitchenettes)  <br />Demolition  <br /> Demo Flooring  <br /> Demo Entry Door, Frame and Hardware  <br /> Demo Window  <br /> Demo Existing Kitchenettes (Building B)  <br /> Demo Vanity and Sink  <br /> Demo Plumbing Fixtures, Sink, Tub/Shower as required  <br /> Demo Interior Wall @ Vanity and Tub/Shower  <br /> Demo Interior Bathroom Walls ((A‐101‐106, 201‐206, 301‐306)(B‐118‐128, 220‐230, 322‐333)  <br /> Patch and Repair existing drywall to receive new texture  <br />o Will Bid Alternate to Overlap existing drywall with New ¼” Drywall  <br />Remodel  <br /> New Vinyl Plank Flooring  <br /> New Entry Door with Peep Hole and Doorbell  <br /> New Kitchenette  <br />o Cabinets – Uppers and Lowers  <br />o Countertops and 4” Back Splash  <br />o Appliances  <br /> 12cf Refrigerator  <br /> 15” Electric Cooktop  <br /> 24” Hood  <br /> 0.7cf Microwave  <br /> New Bathroom  <br />o Vanity  <br />o Countertop  <br />o Sink, Faucet and Garbage Disposal  <br />o Medicine Cabinet  <br />o Mirror  <br />o Water Closet  <br />o Tub/Shower Surround  <br />o Bath Accessories  <br /> TP Dispenser  <br /> Towel Bar – 24”  <br />o Vanity Light  <br /> New Texture and Paint  <br /> New Electrical Lighting and Power as required  <br /> New Mechanical  <br />o New PTAC   <br />o New Kitchen Exhaust Fan (Hood)  <br />o New Bathroom Exhaust Fan   <br /> New Plumbing Fixtures with associated Piping  <br />o Water Closet  <br />o Lavatory  <br />o Kitchen Sink and Faucet  <br />o Tub/Shower Enclosure  <br />   <br />EXHIBIT 3