My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - Agreement with CLR Design, Inc. for Bidding and Construction Administration
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
04/20/2021 Regular
>
Item 24 - Agreement with CLR Design, Inc. for Bidding and Construction Administration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:41:36 PM
Creation date
8/21/2023 5:10:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
24
Date
4/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. THE PROJECT <br />The project area is approximately .75 acres +/- in size and includes the following key program elements: <br />• Renovation to the existing animal holding building <br />• Renovation to Amazon's Edge Habitat to house Giant River Otters in a themed naturalistic <br />riverine environment <br />• New Howler Monkey Habitat <br />• Primate Trail Systems <br />• New Underwater View Area of Otters for Guests <br />• Redevelopment of the existing Deck View Shelter <br />• New/enhanced Visitor Pathways and Landscape <br />• Water Filtration System (LSS) for the Otter Pools <br />• Misc. rail systems, fencing, irrigation, lighting, and site furnishings <br />• Coordination with Interpretive Graphics and Elements <br />Budget: We understand the Construction Budget to be $3.6M +/- exclusive of soft costs and any <br />other direct Owner/City costs. <br />3. SCOPE OF WORK <br />Our Team has completed Preliminary Design and Conceptual Design (Tasks 1 and 2), Design <br />Development (Task 3), Construction Documents (Task 4) and Permitting (portion of Task 5.1) to date. <br />See the original 12/2016 Agreement for a description of these work phases. <br />CLR will provide Bidding and Construction Administration phase services for the project described above <br />including architecture; landscape architecture; exhibit design; caging design; and coordination of <br />structural engineering; MEP engineering; civil, and life support system engineering. <br />TASK 5.1: Bidding <br />The key Design Team members will participate in a pre -bid meeting(s) as necessary in order to present <br />the project to bidders and answer questions. We feel that it is critical with the uniqueness of zoo <br />projects such as this, that we participate in giving bidding contractors the "big picture" as well as answer <br />detailed questions. The Design Team will also be available by telephone/web-based meeting during the <br />bid process to answer questions. <br />Key Tasks: <br />• Participate in pre -bid walk-thru and interview contractors as needed <br />• Review and respond to contractor RFI's during the bid period <br />• Issue clarifications to the Bid Documents/Addendum if necessary, for both contractors and City <br />Agencies as part of the permitting process <br />• Review Substitution Requests submitted by the contractors <br />• Assist with analysis of construction bids and participate with the Zoo/CM to make final <br />recommendations <br />TASK 5.2: Construction Administration <br />The unique nature of zoo facilities and construction requires the experienced involvement of CLR as well <br />as the day to day availability of our local engineering firms. It is anticipated that CLR will attend <br />approximately one meeting per month on -site at critical stages during construction. The CLR Team will <br />provide the necessary services outlined below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.