My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Warner Avenue Street Improvements (Main Street to Oak Street)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
Item 17 - Warner Avenue Street Improvements (Main Street to Oak Street)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 4:58:04 PM
Creation date
8/21/2023 5:24:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
3/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Warner Avenue Improvements: Phase 1 - Main to <br />Oak <br />PROJECT CATEGORY: <br />Street Improvements - <br />Street/Bridge Improvements & Widening <br />LOCATION MAP <br />CITY OF SANTA ANA FY 20/21 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Warner Avenue between Main <br />Street and Oak Street from 2 to 3 lanes in each direction. <br />The project also includes additional left turn lanes at Main <br />Street, bus turn outs, raised medians, and bike lanes along <br />Warner Avenue between Main Street and Oak Street. <br />PROJECT COSTS FV 20/21 FV 21/22 FV 22/23 <br />Construction $1,992,867 <br />TOTAL $1,992,867 <br />SOURCE OF FUNDS FY 20/21 FV 21/22 FV 22/23 <br />AREA FEES $1,992,867 <br />TOTAL $1,992,867 <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) Strategic <br />Plan Technical Report identified the need for Warner <br />Avenue to be widened to a six -lane major arterial to meet <br />MPAH requirements. The existing Average Daily Traffic <br />(ADT) is in excess of 29,600 vehicles per day. The <br />proposed improvements will allow the segment to <br />accommodate future traffic volumes at a Level of Service A <br />and increase operational efficiency. <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 <br />FY 23/24 FY 24/25 FV 25/26 FV 26/27 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Kenny Nguyen, Senior Civil Engineer 23-Feb-2021 <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.