Laserfiche WebLink
PROJECT TITLE: <br />Warner Avenue Improvements: Phase 1 - Main to <br />Oak <br />PROJECT CATEGORY: <br />Street Improvements - <br />Street/Bridge Improvements & Widening <br />LOCATION MAP <br />CITY OF SANTA ANA FY 20/21 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Warner Avenue between Main <br />Street and Oak Street from 2 to 3 lanes in each direction. <br />The project also includes additional left turn lanes at Main <br />Street, bus turn outs, raised medians, and bike lanes along <br />Warner Avenue between Main Street and Oak Street. <br />PROJECT COSTS FV 20/21 FV 21/22 FV 22/23 <br />Construction $1,992,867 <br />TOTAL $1,992,867 <br />SOURCE OF FUNDS FY 20/21 FV 21/22 FV 22/23 <br />AREA FEES $1,992,867 <br />TOTAL $1,992,867 <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) Strategic <br />Plan Technical Report identified the need for Warner <br />Avenue to be widened to a six -lane major arterial to meet <br />MPAH requirements. The existing Average Daily Traffic <br />(ADT) is in excess of 29,600 vehicles per day. The <br />proposed improvements will allow the segment to <br />accommodate future traffic volumes at a Level of Service A <br />and increase operational efficiency. <br />FY 23/24 FY 24/25 FY 25/26 FY 26/27 <br />FY 23/24 FY 24/25 FV 25/26 FV 26/27 <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Kenny Nguyen, Senior Civil Engineer 23-Feb-2021 <br />- 1 - <br />