Laserfiche WebLink
7. Check exhaust fan belts for wear, replace as required. <br />8. Check belt tension and sheave alignment and adjust as required. <br />9. Inspect exhaust fan unit assembly as required. <br />10. Check all mounting hardware and tighten as required. <br />Pneumatic Air Compressor: <br />1. Inspect unit, check for rust spots, oil leaks & general condition of unit as required. <br />2. Drain tank, check auto drain as required. <br />3. Check belt, adjust tension & sheave alignments, and replace belt as required. <br />4. Meg -ohm and record, as required. <br />5. Check starter wiring & contacts as required. <br />6. Check motor amperage & voltage as required. <br />7. Check intake air filter, replace as required. <br />Air Handlers: <br />1. Provide four (4) quarterly inspections and maintenance for (21) Air Handlers. <br />2. Preventive maintenance as required. <br />3. Lock -out and Tag -out equipment as required. <br />4. Check starter contacts for excessive wear as needed. <br />5. Tighten all starter wire connections as required. <br />6. Check belts, adjust or replace as needed. <br />7. Check pulley sheave alignment, adjust as required. <br />8. Meg -Ohm motor and record annually. <br />9. Check fan motor(s) amps. <br />9. Clean and lubricate unit motor bearings and fan bearings. <br />10. Check operation of economy dampers. <br />11. Lubricate all dampers and linkages as necessary. <br />12. Check operation of static vane (if applicable) <br />13. Visually check all coils for leaks (Annually) <br />14. Check and record all coil delta T (Annually) <br />15. Inspect all mounting hardware, tighten as needed. <br />Multi -zone Air Handlers: 911 Dispatch Area <br />1. Provide annual Preventive Maintenance Inspection on two (2) York Air Handlers. <br />2. Preventive maintenance as required. <br />3. Lock -out and Tag -out equipment as required. <br />4. Check fan motor amps as required. <br />5. Clean and lubricate components as required. <br />6. Check operation of economy dampers as required. <br />7. Check operation of static vane or dampers as required. <br />8. Check operation of zone dampers as required. <br />9. Check and adjust operating and safety controls as required. <br />Package Chiller: <br />1. Lock -out and Tag -out equipment as required. <br />2. Check condenser / Barrel tubes as required. <br />3. Check Chiller barrel tube as required. <br />4. Check and record unit amp draw as required. <br />5. Check unit Voltage and Record as required. <br />