Laserfiche WebLink
STATE OF CALIFORNIA+ DEPARTMENT OF TRANSPORTATION <br />PROJECT PROGRAMMING REQUEST <br />OTP-0001 (Revised July 2017) <br />6exnaral 7nsinrclrnrvd <br />Amendment (Usling Prolect) Na Data: 5/13/20 <br />�"DittriOCSEA <br />(-i "?:., „•Projecf; ID,.., . <br />-'PP.NO <br />MP.O^ID F : %"} ' - iaD � .-, ; <br />12 <br />Colin <br />Route/Corridor <br />' PM. BK <br />PM Ahd <br />O A <br />Main <br />N/A <br />I N/A <br />Orange Count Transport tion Authority (OCTA <br />,kL&,� <br />SCAG Local Assistance <br />Pto eof ManagerlCorttacf' <br />;Phone., <br />' v, <br />.. ;, E=rttail;AddYessr, -_ <br />Gary Hewitt <br />714 560-5715 <br />a "tt oe t <br />Pe0j"tTitie...y:t <br />Route531553 Bus Stop Improvements <br />Location(Project Limits; DescriptiomfaeopgofyV4r1k)+ xM77 `` <br />The project will install real-time display & Bravo! signage at up to 23 bus Stops and up to three new shelters along the <br />Bravol Main Street Rapid Bus and OC Bus Route 63163X corridor. Route 63163X operates from Anaheim through <br />Orange and Santa Ana to Irvine via Main Street and Bravol Main Street Rapid Bus (Route $33) operates on Main Street _. <br />from Anaheim f;egionatTransportation"nterinodai Center'to ManArihur Boulevard fn Sanfa Ana. ' <br />Com orient, ,� <br />"�-;, Am IeiWi'entin" 'enc ,1 <br />PA&ED <br />OCTA, <br />PS&E <br />OCTA <br />Rr ht of Way <br />N/A <br />Construction JOCTA <br />Lggisl`dtiye Dlstdctsr' <br />Aseomblyr fiH, He, 74 Senate: 34,37 Congressional: <br />ProjeStBene(its, • - " y-�, , rc,t � <br />-Rrovides real time information on next bus arriving at bus. stops <br />-Identifies bus stop as a Bravo[ Main stop and advertises the service. <br />-Mrovldes additional protection & comfort for passengers waiting at up to two stops. <br />-Mods shift from short local vehicular trips will reduce CO2 emissions, <br />•Oonnects to the ARTIC, which Provides services to Metrolink and the Amtrak Pacific Surflfnerinto Los Angeles, <br />Riverside, San Bernardino, San Diego; Ventura, and into San Luis Obispo. <br />,Oonnects to John Wayne International Airport (SNA). <br />Purpo;e and Need -i <br />The corridor is currently one of OCTA's most popular routes with over 2.1 million boarding's annually, The corridor <br />serves transit dependent disadvantaged and low-income communities, <br />(See page 2). <br />Intercity Rail/MassTransit <br />Station improvements <br />each <br />23 <br />ADA Improvements No <br />Sike/Ped improvements No , E3everstbititepe analysis.'- <br />:: No <br />includes Sustainable Communifes Strategy 0716 yes - Reduces Greenhouse Gas. Emissions Yes <br />Pro act Milestone, . , ; <br />" EXistip - ! � . <br />': Pro o§od <br />Pra'ectStud Re ortA proved <br />N/A <br />Begin Environmental (PA&ED) Phase <br />N/A <br />Circulate Draft Environmental Document Document T e CE <br />N/A <br />Draft Project Report <br />N/A <br />End Environmental Phase (PA&ED Milestone) <br />N/A <br />Begin Des n (PS&E}phase <br />7/l/2020 <br />End Design Phase (Ready to Lfst for Advertisement Mi estone) <br />6130/2021 <br />Be in Right of Way Phase <br />N/A <br />En Right of Way Phase (Right ofM Certification Milestone) <br />NIA <br />Begin Construction Phase (Contract Award Milestone) <br />1211512021 <br />End Construction Phase Construction Contract Acceptance Milestone) <br />12/15/2022 <br />Begin Closeout has,,12 <br />15/2022 <br />End Closeout Phase Closeout Report) <br />12/1612023 <br />ADA Notice LO.todmovarema,emsmyu,xauomae,oneuxumamraavalsole,nsltenlMUnr=S.Forin formation call (916)654-6410orTOO (W)654-3880 <br />or wo, Recow. and Fettos Managerreanp 1120 N Sbool. MS-60. Sacramento, CA 93e14. <br />